Laserfiche WebLink
' EEC assisted with FOG Control Program development, including: <br /> • Development of a FOG Control Program Manual including recommended policies and procedures, <br /> FSE inspection checklists, Notices of Violence (NOV) forms, and an enforcement response plait <br /> • FOG Control Ordinance development <br /> • Recommendations for education/enforcement Eor FSEs identified as causing/contributing to a FOG <br /> blockage <br /> EEC is currently conducting on-going FSE inspections and enforcement on a contract basis including: <br /> • Performing more than 3A00 FSE inspections to this point involving Kitchen I3MP and grease <br /> ' interceptor/grease trap compliance inspections <br /> • Education of each FSE inspected explaining the FOG Control Program and the benefits of the FSE <br /> controlling their FOG discharge <br /> ' • Conducting all of the FSE enforcement activities with the exception of the highest level enforcement <br /> activities (e.g., requirement for a grease interceptor retrofit) which aze conducted by the FOG Control <br /> Program Manager based on EECs recommendations <br /> • Prioritizing those FSEs that aze upstream of sewer system Hot Spots <br /> • Management of waivers and variances <br /> • Management of the FOG data through database deveIo went and maintenance <br /> P <br /> EEC Currently manages the CMS1Ys FOG Program and inspectors, including. <br /> • Prioritizing FSEs based on Hot Spots status, GRE status, and compliance history <br /> • Management of waivers and variances <br /> • Management of the FOG data through database development and maintenance <br /> ' • Management of the FOG Program GLS <br /> ' Project Name: The Orange County FOG Control Study & Program Development <br /> Client Contact: Makin Talebi/ Mark lCawamota, Tel (7'14} 962-2411 <br /> ' EEC conducted the Orange County FOG Control Studies (Phase 1 and Phase 2) involving: <br /> • Research of numerous FOG Control Programs around the country <br /> • Development of the FOG Characterization approaclt, the conditional waiver concept, and FSE <br /> education, inspection and enforcement strategies <br /> • Development of a Model FOG Control Ordinance <br /> • Multiple regional stakeholder meetings involving topics such as ordinances, FSE inspection and <br /> enforcement, Kitchen BMPs, grease interceptor design and sizing, FOG waste hauling and disposal <br /> • Extensive field testing of FOG control technologies <br /> EEC completed a comprehensive FOG Characterization Study involving: <br /> ' Prioritization of 36 FOG-related sewer system Hot Spots <br /> • CCTV Inspection of 18 FOG-related sewer system Hot Spots <br /> • Inspection of 215 FSEs <br /> ' Conducting education far each FSE inspected explauting the FOG Control Program and the benefits of <br /> the FSE controlling their FOG dischazge <br /> • Development of a FOG Characterization Report which included a summary of all the Hot Spots and <br /> ' FSE data and recommendations for development of the FOG Control Program and FSE enforcement <br /> follow-up <br /> EEC assisted in development of the FOG Control Program including: <br /> • Development of a FOG Control Program Manual including recommended policies and procedures, <br /> FSE inspection checklists, NOV forms, and an enforcement response plan <br /> • Assisting in the development of the FOG Control Ordinance <br /> • Recommendations for education and/or enforcement of the FSEs that were identified as causing or <br /> ' contributing to a FOG blockage <br /> <br /> i <br /> <br /> I <br /> City of Santa Ana -FOG Program Management Proposal 3 EEC <br /> 25H-17 <br /> <br />