My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PBS&J 3a
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PBS&J 3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 2:58:55 PM
Creation date
4/28/2010 1:27:10 PM
Metadata
Fields
Template:
Contracts
Company Name
PBS&J (ATKINS NORTH AMERICA INC)
Contract #
A-2008-128-001
Agency
Planning & Building
Council Approval Date
6/2/2008
Expiration Date
6/30/2010
Insurance Exp Date
9/30/2010
Destruction Year
2016
Notes
Amends A-2008-128 Amended by A-2008-128-003 - 4/1/11 OFFICIAL NAME CHANGE TO ATKINS NORTH AMERICA INC.
Document Relationships
PBS&J 3
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
PBS&J 3b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fire Protection <br />PBS&J will revise the section to include new information regarding fire protection. PBS&J will <br />contact the Santa Ana Fire Department (SAFD) for information (if necessary) on response times <br />and current and planned staffing levels. Existing demand for fire services in the project area will also <br />be described. <br />Using factors developed in consultation with the SAFD, the EIR will evaluate the ability of the Fire <br />Department to serve the project site. <br />Schools <br />PBS&J will revise the section to include new information regarding schools. Analysis will be <br />performed to understand current and future student enrollment trends, which will lead to the <br />development of a school mitigation plan. The EIR will describe existing and projected school <br />enrollment for the Santa Ana Unified School District. Any existing or planned schools in the vicinity <br />of the project area will be identified. <br />Libraries <br />PBS&J will revise the section to include any new information regarding the Santa Ana Library <br />Department, its capacity, or plans for expansion. This information will be reported in the DEIR. <br />Based on input from the City and County, the project demand will be evaluated, along with the need <br />for additional facilities. <br />Recreation <br />The EIR will revise and identify existing and planned park facilities in the City, and the City's park <br />standards through consultation with the City's Parks, Recreation, and Community Services Agency. <br />The EIR will quantify the demand for parkland generated by maximum residential build -out in the <br />project area, based on the City's park standards. <br />Transportation and Circulation <br />Transportation and Circulation is likely to be one of the major issues to be addressed in the EIR. <br />Katz, Okitsu & Associates (KOA) will prepare a new technical transportation study. The scope of <br />the traffic study is intended to meet the City of Santa Ana requirements for analysis of traffic <br />impacts associated with this project. KOA will meet with City staff to discuss the project, the <br />proposed method of analysis, and other relevant considerations. At such, time, KOA will verify the <br />study approach and any additional specific study requirements prior to any data collection. KOA will <br />discuss potential traffic issues with the City's personnel to identify any additional concerns and <br />recommendations. <br />Study Orientation and Scope Refinement <br />KOA senior staff would meet with City staff to discuss the revised project, the proposed method of <br />analysis, and other relevant considerations. We will verify our approach and any additional specific <br />
The URL can be used to link to this page
Your browser does not support the video tag.