My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PBS&J 3a
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PBS&J 3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 2:58:55 PM
Creation date
4/28/2010 1:27:10 PM
Metadata
Fields
Template:
Contracts
Company Name
PBS&J (ATKINS NORTH AMERICA INC)
Contract #
A-2008-128-001
Agency
Planning & Building
Council Approval Date
6/2/2008
Expiration Date
6/30/2010
Insurance Exp Date
9/30/2010
Destruction Year
2016
Notes
Amends A-2008-128 Amended by A-2008-128-003 - 4/1/11 OFFICIAL NAME CHANGE TO ATKINS NORTH AMERICA INC.
Document Relationships
PBS&J 3
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
PBS&J 3b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
study requirements prior to any data collection. We will discuss potential traffic issues with the City <br />staff to identify any additional concerns and recommendations. <br />Study Scope <br />KOA will calculate daily and peak hour trips for the Project based on the Institute of Transportation <br />Engineers Trip Generation, Seventh Edition, and previous trip generation experience. We will then <br />distribute the trips generated to determine if any intersections will be impacted by the proposed <br />project. <br />The scope of the project will be similar to the previous study which included 50 intersections, <br />including about 35 in the study area and 15 at key access points to the study area, such as freeway <br />interchanges. KOA will perform the analysis for the surface street network using the TRAFFIX <br />software. The analysis will be based upon the City -approved methodology for City intersections. <br />The Freeway ramps or intersections controlled by Caltrans, within the area, will be based upon the <br />Caltrans-preferred HCM methodology, unless told otherwise. <br />A regional travel forecasting model will be used to assist in providing future traffic forecasts for the <br />subject project. KOA will coordinate with OCTA to obtain forecasts of future traffic for the "no <br />project" scenarios. KOA will also prepare a supplemental forecast for the "with project" scenarios. <br />Data Collection & Field Review <br />Traffic Data <br />Peak period intersection traffic analysis will be required for up to 50 intersections during the AM <br />and PM Peak hours. These intersections will be determined after consultation with the City and <br />analysis of project related traffic generation increases, but the locations will generally consist of <br />selected signalized and unsignalized intersections with the Study Area and northeast toward the I-5 <br />Freeway interchanges at Main Street, 17th Street, Grand Avenue, and First/Fourth Street. <br />The traffic counts will be taken by a traffic count specialist, Traffic Data Services of Santa Ana or <br />The Traffic Solution of Arcadia, depending upon scheduling, and availability. <br />Future traffic volume information will be obtained from a traffic model maintained by OCTA. <br />Field Review <br />KOA will review the location and intersections in the field to observe and inventory roadway <br />geometrics, existing traffic operation, traffic signal parameters, and relevant information during peak <br />hours. <br />Report Preparation & Definitions <br />KOA will prepare a traffic study similar to the previous study that will include the following (at a <br />minimum) : <br />I. Existing Conditions <br />> Intersections <br />
The URL can be used to link to this page
Your browser does not support the video tag.