■ Four (4) unbound copies of the 1" and 2"' Administrative Draft EIR for City staff review. <br />■ One (1) electronic copy of the 1" and 2"`' Preliminary ADEIR. <br />■ Distribute fifty (50) bound copies of the Draft EIR for public review (this number includes 15 <br />copies of the Draft EIR that are submitted to the State Clearinghouse). <br />■ Provide one (1) clean reproducible original of the Draft EIR and one (1) electronic copy. <br />■ Distribute four (4) unbound copies of the Administrative Final EIR and Draft MMP for City <br />staff review. <br />■ One (1) electronic copy of the Administrative Final EIR and Draft MMP. <br />■ Distribute twenty-five (25) copies of the Final EIR and Final MMP. Production of the Final <br />EIR is not included in the attached cost proposal. <br />■ Provide one (1) clean reproducible original of the Final EIR. and Final MMP and one (1) <br />electronic copy. <br />Factors that would increase the scope of work and estimated costs outlined in the proposal include: <br />new issues to be evaluated; attendance at additional public meetings; printing of additional copies of <br />reports or the need to distribute a second ADEIR or Screencheck version of the document; analysis <br />of additional issues above those discussed in this proposal or a more detailed level of analysis than <br />described in this proposal; changes in the project requiring reanalysis or rewriting of report sections; <br />collection of data required for the EIR beyond that described in this proposal; attendance at <br />additional in-house meetings beyond those budgeted; and excessive public comments on the DEIR, <br />or comments on the ADEIR or AFEIR related to substantial changes to the project description. <br />PBS&J would notify the City immediately (and prior to proceeding with out -of -scope work), if any <br />of these conditions appears likely to occur. We would propose to renegotiate these items, if required, <br />or charge on a time -and -materials basis. The breakdown of our proposed cost estimate is valid for <br />60 days from the date of this proposal. The estimated cost is based on all team members' standard <br />hourly rates. See attached Estimated Budget. The total cost to complete the EIR through <br />certification is $186,816. This figure represents $77,980 to complete the project revisions (including <br />technical analyses) plus the remaining un-billed $69,736 in the Santa Ana Renaissance Specific Plan <br />EIR. <br />