My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY FLOOD CONTROL DISTRICT (3) -2008
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY FLOOD CONTROL DISTRICT (3) -2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2014 5:43:17 PM
Creation date
5/6/2010 12:35:50 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY FLOOD CONTROL DISTRICT
Contract #
A-2008-289
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
11/17/2008
Insurance Exp Date
9/20/2011
Destruction Year
2040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Santa Ana River Channel <br />E01- R1551, R1553 <br />Inspect equipment nt regularly <br />• Designate a responsible party to check uncle, deliver,., vehicles for leaking fluids. spilled <br />materials, delbais. or other foreign materials. <br />• Check loadina- unloadjng equipment regularly for leaks. <br />If possible, conduct loading and unloading in dry weather. <br />Training <br />1. Train employees on these BMPs, storm water discharge prohibitions. and wastewater <br />discharge requirements. <br />2. Train employees on proper spill containment and cleanup. <br />S Establish training that prcmdes employees Mth the proper tools and knowledge to immediately <br />begin cleaning up a spill. <br />• Ensure that employees are iamihar with the sites spill control plan an dfor proper spill cleanup <br />procedures. <br />• BMP IC 1 i discusses Spill Preventon and Control in detail. <br />3. Train employees on the proper techniques used during liquid transfers to avoid leaks and <br />spills. <br />4. Train forklift operators on the proper loading and unloading procedures. <br />5. Establish a regular training schedule, train all new employees, and conduct annual <br />refresher training, <br />S. Use a training log or similar method to document training. <br />Stencil storm drains <br />Storm drain system signs act as highly visible source controls that are typically stenciled directly adjacent to <br />storm drain inlets Stencils should read 'No Jumping Drains to Ocean ". <br />References <br />California Storm'ater Best Management;%ciice Handbook. Industrial and Commercial- 2003. <br />m wv � cabrnphand baaks.com <br />California Storm 14'ater Best Management Practice Flandbooks_ IndustriaUGommercial Best Management <br />Practice Handbook. Prepared by ,:amp Dresser& McKee, Larry O alker Associates, Uribe and Associates, <br />Resources Pianning ,Associates for Stormwater Quality Task Force. March 1993. <br />Model Urban Runoff Program: A How -To Guide for Developing Urban Runoff Programs for Small <br />10unicipalities. Prepared by City of !yonterey, G4 of Santa Gruz, Ca lifornia Coastal Commission; Monterey <br />Bay tVaiional Marine Sanctuary' Association of Monterey Bay Area Governments, Woodw-ard'' l'yde, Central <br />Coast Regional ^rater Quality Control Board. July 19°$ (Revised February 20102 by the California Goastal~ <br />Commission). <br />Stormwater Man agen ant Manual for We stem .Washington. Volume IV SOULVe Control BMPs. Prepared by <br />'A'a.shington State Department of Ecology Water Quality Program. Publication No. 49-14. August 2071. <br />For additional information contact: <br />County of Orange <br />*atershe; & Coastal Resource,; <br />Storrwater Proararn <br />(714)-9fj:7-6363 <br />or visit our vrebsite at <br />Aat @!Surds.com <br />IC 10 0•stdoor Load n_e'� alo dam= of <br />Edna Park Lease (06.16.09) <br />
The URL can be used to link to this page
Your browser does not support the video tag.