Laserfiche WebLink
.,_ <br />MEMORANDUM � <br />David Ream <br />To: City Manager Date: February 8, 2011 <br />Raul Godinez II, Executive Director <br />From: Public Works Agency <br />Subject: PROJECT NOS: 09 -9108 and 08 -9097 <br />PLAZA OF THE FOUNTAINS — FOUNTAINS NOS. 1 AND 3 RENOIVATIONS <br />CHANGE ORDER NO. 1 <br />Contractor: South Coast Pool Plastering, Inc. <br />12012 Riverside Dr. <br />Lakeside, CA 92090 <br />Project Description: PLAZA OF THE FOUNTAINS — FOUNTAINS NOS. 1 AND 3 <br />RENOIVATIONS <br />Change Order Number: 1 <br />Account Units: 07413260 <br />07413260 <br />Original Contract Cost <br />Amount of The <br />Change Order: <br />Previously Approved <br />Change Orders: <br />Total Change Orders: <br />*: Contract contingency is 20% <br />REASON FOR CHANGES <br />Accounts: 66220 <br />66220 <br />$249,600 <br />$ 25,988 <br />$ -O- <br />$ 25,988 <br />Amount: $25,988 <br />Activities: 09910801028 <br />08909701028 <br />of Original <br />10.4% <br />O% <br />10.4 %" <br />1. The contract documents called for the demolition of the existing sloped veneer <br />around the Fountain No. 3 and to infill that area with a 4 to 7 -inch concrete band <br />to match the adjacent walk. This work is taking place on a structural slab which is <br />above the civic center parking area. The contract did not address any water <br />proofing underneath the new concrete band, which was needed to keep the <br />parking area dry. Therefore, it was recommended to change the detail to include <br />waterproofing between the structural slab and the new concrete band. <br />Agreed Price = $3,042.00 <br />