My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTH COAST POOL PLASTERING, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
SOUTH COAST POOL PLASTERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:12:59 PM
Creation date
5/6/2010 4:27:17 PM
Metadata
Fields
Template:
Contracts
Company Name
South Coast Pool Plastering Inc.
Contract #
09-9108
Agency
Public Works
Council Approval Date
4/5/2010
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NOS: 09 -9108 and 08 -9097 <br />PLAZA OF THE FOUNTAINS — FOUNTAINS NOS. 1 AND 3 RENOIVATIONS <br />CHANGE ORDER NO. 1 <br />February 8, 2011 <br />Page 2 <br />2. The contract documents called for removal of the existing veneer on the planter <br />walls and providing a sandblast finish afterwards. After removing the veneer it was <br />discovered that the existing concrete walls had rock pockets and the unfinished <br />surfaces which would not provide the desired appearance. Parks Department has <br />requested to sack and patch the existing planter walls and apply a smooth white <br />stucco finish afterwards. <br />Agreed Price = $11,848.00 <br />3. Parks Department has requested to add an additional 125 linear feet of wall cap <br />at the existing planter and fountain in front of the law library. <br />Agreed Price = $6,304.00 <br />4. During construction of Fountain No. 3 it was discovered that the existing wind <br />sensor was damaged and not operational. It was recommended to install a new <br />wind sensor with mounting pole, conduit and wires. <br />Agreed Price = $4,794.00 <br />� APPROVED AS TO FUNDS AND ACCOUNTS: <br />Raul odinez, II Francisco Gutierrez w,,�i <br />Executive Director Executive Director '� O <br />Public Works Agenc Finance and Management Services Agency <br />K:\ Construction \Projects \09 -9'108 \Change Orders \09 -9108 RFA CO 1 .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.