My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PARK WEST LANDSCAPE, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PARK WEST LANDSCAPE, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:11:13 PM
Creation date
5/6/2010 4:35:57 PM
Metadata
Fields
Template:
Contracts
Company Name
PARK WEST LANDSCAPE, INC.
Contract #
09-9109
Agency
Public Works
Council Approval Date
4/19/2010
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
?_ CITY OF SANTA ANA <br />y , PUBLIC WORKS AGENCY <br />?' " I CONTRACT CHANGE ORDER <br />?' <br />Project Number PROJECT NO. 09-9109 -PLAZA OF THE FOUNTAINS Change Order Number 1 <br />- PLANTER RENOVATION AND JOINT REPAIR <br />To Park West Landscape, Inc_ Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by Pl1Rl IC W(7RKS Ac?F NCY <br />EXTRA WORK AT AGREED PRICE <br />1 . Provide and install 3,785 sq ft waterproofing at PCC bands around the existing planters as <br />directed per City of Santa Ana. <br />AGREED PRICE _ $34,165.00 <br />2. Remove and replace 150 If of cracked ductile iron drain pipe, 20 locations, as directed per <br />City of Santa Ana. <br />AGREED PRICE _ $1,465.00 <br />3. Increase the width of the new wall cap by 1-1/2", 800 If of wall cap, as directed per City of <br />Santa Ana. <br />AGREED PRICE _ $1 ,935.00 <br />4. Repair 560 sq ft of the PCC planter floor located by the State Building as directed per City of <br />Santa Ana. <br />AGREED PRICE _ $1,024.00 <br />5. Provide and install new clean outs at each drain, 29 locations, as directed per City of Santa <br />Ana. <br />AGREED PRICE _ $3,190.00 <br />6. Core the existing planter wall located at the northwest stairwell to install a new 3" drain as <br />directed per City of Santa Ana. <br />AGREED PRICE _ $209.00 <br />7. Provide and install 230 If ft of wall cap at the two planters located by the south stairwell as <br />directed per City of Santa Ana. <br />AGREED PRICE _ $8,177.00 <br /> <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.