My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI GROUP 4 - 2010
Clerk
>
Contracts / Agreements
>
I
>
IBI GROUP 4 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:49:11 PM
Creation date
5/11/2010 11:31:38 AM
Metadata
Fields
Template:
Contracts
Company Name
IBI GROUP
Contract #
A-2010-053
Agency
PUBLIC WORKS
Council Approval Date
3/15/2010
Expiration Date
6/30/2011
Insurance Exp Date
4/30/2011
Destruction Year
2016
Notes
WC Exp: 01/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
45 <br />• Regulatory Risks <br />• Design Schedule Delay Risks <br />( • Construction Schedule Delay Risks <br />• Force Majeure Risks such as Earthquake, Flood and Others <br />Deliverables: <br />• Cost Methodology Report for Capital and O&M Cost Estimates <br />• Draft and Final Preliminary Capital Cost Estimate Report <br />• Draft and Final Preliminary Operations and Maintenance Cost Estimate Report <br />Task 8 - Funding Source Identification <br />Objective: To investigate a full range of potential funding sources and identify the relative advantages and <br />disadvantages of each source. <br />Approach: A funding source report will be developed that identifies and evaluates potential traditional and <br />innovative revenue sources. The evaluation of potential sources will include documentation of permissible <br />uses; ease of application/implementation; potential funding magnitude; local match requirements; <br />funding application deadlines; and the potential for local assistance. Additionally, the report will provide a <br />preliminary analysis of financing scenarios which will place different levels of emphasis on federal, state, <br />and local funding sources, any innovative approaches identified, and potential cost sharing arrangements <br />among the multiple operators that will use the facility. Challenges in this task include; <br />• Identification of sources with higher potential to provide adequate revenues; <br />• Ability to tier revenue sources to allow for phased receipt of revenue for conceptual design, preliminary <br />and final design, construction, as well as on-going operations and maintenance; <br />• Identification of potential revenues from possible shared users and from transit-supportive uses. <br />The following three step process will be used to evaluate, screen, and refine possible funding sources and <br />develop preliminary financial strategies. <br />Step 1. Identify and Screen Inclusive Long List of Potential Funding Sources <br />• Develop and present to City of Santa Ana and OCTA staff an inclusive "long" list of potential capital and <br />operating and maintenance (O&M) funding sources which will include traditional federal, state and local <br />programs and innovated approaches. The "long" list will be summarized in a matrix and will also indicate <br />if the various sources can be used for capital uses, annual O&M costs or both. <br />Additionally, a series of potential evaluation criteria to narrow down the "long" list will be presented for <br />review and comment by City and OCTA staff. These criteria could include but not be limited to the <br />following: <br />City of Santa Ana <br />Santa Ana Regional Transportation Center Master Plan IBI Group 1.25.10