My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI GROUP 4 - 2010
Clerk
>
Contracts / Agreements
>
I
>
IBI GROUP 4 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:49:11 PM
Creation date
5/11/2010 11:31:38 AM
Metadata
Fields
Template:
Contracts
Company Name
IBI GROUP
Contract #
A-2010-053
Agency
PUBLIC WORKS
Council Approval Date
3/15/2010
Expiration Date
6/30/2011
Insurance Exp Date
4/30/2011
Destruction Year
2016
Notes
WC Exp: 01/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44 <br />Task 7 - Cost Estimates <br />Objective: To develop preliminary capital and operations and maintenance cost estimates for each phase <br />of the SARTC Master Plan implementation for three horizon years 2014, 2020 and 2040 buildout. To <br />conduct a risk analysis. <br />Approach: The following approach will be used to develop the Capital Cost Estimates and the Operations <br />and Maintanence estimates. <br />Capital Cost Estimates: <br />The capital cost for each phase of the project will be calculated at the Conceptual Design level of accuracy. <br />The costs will be prepared according to the Federal Transportation Authority guidelines using the FTA <br />standard cost categories that are used in all grant applications. These costs are based on a mix of industry <br />standards and experience gained form evaluation of similar projects. The conceptual design level will show <br />the general layout of the facilities at each phase 2014, 2020 and at Build Out. Drawings will be prepared <br />that show all features for each of the design concepts in sufficient detail for quantities to be taken off. <br />The concepts will include but not necessarily be limited to: <br />1. A modest renovation and expansion of the existing facilities. <br />2. A major rehabilitation and expansion of the entire transport center. <br />3. Demolition of the existing facilities and design of a completely new facility <br />A matrix cost evaluation will be prepared in which these, or other options to be agreed, will be costed for <br />each of the three development phases. <br />Operating Cost Estimates: <br />Operating and Maintenance Costs will be prepared at Conceptual level of detail from two basic sources: <br />• A cost model will be built that shows each operation and maintenance item together with the staffing <br />required to carry out each task, the equipment required and the probable costs based on this ground- <br />up procedure. <br />• Actual operations and maintenance costs will be obtained from operating systems of a similar nature and <br />size. This historical cost data will be evaluated, updated and modified to suit the Santa Ana situation. <br />• Manufacturers and Suppliers of operating and maintenance equipment will be approached to provide <br />detailed cost estimates for all major cost items. <br />• Contractors will also be approached to provide general information on construction schedules, materials <br />and labor cost trends. <br />Risk Analysis: <br />The risk analysis will be prepared at Concept Level of accuracy. The items included in this analysis will <br />include but not be limited to: <br />• Financial Risks and Financing Methodologies <br />• Inflation Risks
The URL can be used to link to this page
Your browser does not support the video tag.