My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 1B - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
RBF CONSULTING 1B - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:33:14 PM
Creation date
5/11/2010 4:48:58 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2008-130-001
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2010
Insurance Exp Date
11/30/2011
Destruction Year
2017
Notes
Amends A-2007-165, A-2008-130 Amended by A-2008-130-002, -003
Document Relationships
RBF CONSULTING 1 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1A - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1C - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1D - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />�d�'►� Proposal for the Bender Ready -Mix Concrete Manufacturing Project <br />CInitial Study and Mitigated Negative Declaration <br />. INTRODUCTION AND UNDERSTANDING OF <br />THE PROJECT <br />1.1 INTRODUCTION <br />RBF Consulting (RBF) has submitted this revised proposal to prepare an Initial Study and Mitigated <br />Negative Declaration to assess potential impacts and identify mitigation measures for the Bender <br />Ready -Mix Concrete Manufacturing Project in Santa Ana. The evaluation and associated work <br />products will be prepared in accordance with the criteria, standards, and provisions of the California <br />Environmental Quality Act (CEQA) of 1970, Section 21000 et. sec. of the State CEQA Guidelines <br />(California Administrative Code Section 15000), the City of Santa Ana Environmental Guidelines, <br />and the regulations requirements and procedures of any other responsible public agency with <br />jurisdiction by law. RBF will throughout the document, and where appropriate, relate the proposed <br />project to the general trends in the City of Santa Ana and the surrounding area. <br />1.2 UNDERSTANDING OF THE PROJECT <br />It is our understanding that the City of Santa Ana is seeking consulting services in order to prepare <br />and process CEQA compliance documentation for the Bender Ready -Mix Concrete Manufacturing <br />Project. It is our understanding that there is currently an on -site concrete manufacturing operation at <br />the 516 South Santa Fe Street site. In 2006, the Applicant was approved for a warehousing <br />' operation and since that time, the concrete manufacturing has been active. The City is requiring a <br />Conditional Use Permit in order to legalize the facility and operation in order to fully comply with <br />CEQA. <br />The proposed work program, as detailed in Section II, Scope of Work, considers the preparation of <br />an Initial Study as the supporting analysis for a Mitigated Negative Declaration. The project kick-off <br />will confirm the project description, references, scheduling and site visit. The Initial Study will be <br />® prepared in accordance with the CEQA Guidelines Sections 15061, 15162, 16167 and 15168. Each <br />topical area will be analyzed and significance of impacts will be concluded. Mitigation measures will <br />be incorporated, as necessary. The work program includes the preparation of detailed technical <br />studies for Air Quality, Noise and Water Quality. <br />RBF will serve as an extension to staff to assure that the entire CEQA process is conducted in a <br />comprehensive manner, which will include consideration of recent CEQA legislation and <br />requirements of review agencies. The RBF project management team, led by Mr. Glenn Lajoie, <br />_ AICP, and Ms. Rita Garcia, will provide regular and consistent communications and updates to the <br />City's project team on the progression of the work program and status of the analysis. The <br />environmental review process will result in the presentation of the environmental/CEQA findings to <br />the City decision makers for the determination of compliance with CEQA. <br />JN 00-000300.10P 1 August 27, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.