My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 1B - 2009
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
RBF CONSULTING 1B - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:33:14 PM
Creation date
5/11/2010 4:48:58 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2008-130-001
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2010
Insurance Exp Date
11/30/2011
Destruction Year
2017
Notes
Amends A-2007-165, A-2008-130 Amended by A-2008-130-002, -003
Document Relationships
RBF CONSULTING 1 - 2007
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1A - 2008
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1C - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1D - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />i Proposal for the Bender Ready -Mix Concrete Manufacturing Project <br />pW- Initial Study and Mitigated Negative Declaration <br />11. SCOPE OF WORK <br />The following Scope of Work has been prepared pursuant to the information received from the City. <br />The cost estimate, which is itemized according to task and issue, is included in Section IX (Budget). <br />1.0 PROJECT KICK-OFF AND PROJECT DESCRIPTION <br />The work program will be initiated with a kick-off meeting with City representatives to discuss the <br />project features in greater detail. This initial meeting is vital to the success of the CEQA process <br />and will be a key milestone in order to confirm the parameters of the analysis, project construction <br />program, proposed buildout conditions, scheduling and overall communications. Prior to the kick- <br />off, RBF will distribute a kick-off meeting agenda and detailed memorandum, which will identify <br />information needs. The project kick-off will include a visit to the site and recording of on -site and <br />adjacent land use conditions. Based upon the detailed project information obtained at the project <br />kick-off, RBF will draft a preliminary project description for review and approval by City staff. <br />Task 1.0 Deliverables: <br />• Kick -Off Meeting Agenda <br />• Kick -Off Meeting Memorandum <br />• Preliminary Project Description <br />2.0 RESEARCH AND INVESTIGATION <br />RBF will evaluate the necessary information with respect to the proposed project. Project research <br />will include coordination with the City to acquire relevant environmental data, previous studies for the <br />area and other available files, exhibits, maps, and reference documents. The initial investigation will <br />include a site visit, review of existing land uses and environmental conditions, and a photographic <br />recording of on -site and surrounding uses. <br />3.0 FOCUSED STUDIES <br />3A AIR QUALITY ANALYSIS <br />The existing air environment will be described in terms of meteorology, local topography affecting <br />pollutant dispersion, and ambient air monitoring data. A summary of current air management efforts <br />that may be related to the proposed project will be provided with particular emphasis on the <br />applicable requirements of the 2007 Air Quality Management Plan (2007 AQMP), and the <br />requirements for air quality assessments identified in the South Coast Air Quality Management <br />District's CEQA Handbook. Sensitive receptor areas within the project vicinity will be identified. <br />The air quality impacts of the proposed project can be divided into the short-term construction <br />impacts, long-term regional air pollution increases, local operational impacts, and greenhouse gas <br />impacts. <br />Short-term dust and emission generation due to construction activities will be forecasted. Detailed <br />estimates of the potential construction activities including phasing and equipment will be utilized. A <br />JN 00-000300.10P • 2 • August 27, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.