My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION AMERICAS 7b
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
URS CORPORATION AMERICAS 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:53:21 PM
Creation date
6/3/2010 11:48:30 AM
Metadata
Fields
Template:
Contracts
Company Name
URS CORPORATION AMERICAS
Contract #
A-2008-141-001
Agency
PLANNING & BUILDING
Expiration Date
12/31/2011
Insurance Exp Date
5/1/2011
Destruction Year
2018
Notes
Amends A-2007-169, A-2008-141 Amended by A-2008-141-002, -03
Document Relationships
URS CORPORATION 7 (2)
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7a
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7c
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7d
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rns <br />Assessment). The CIA will assess the Project's potential to impact the character and cohesion of the <br />surrounding community and measures, as warranted, to offset those impacts. <br />Task 3. Preparation of Separate Studies for Each Phase 3 and 4 <br />URS' original Scope of Work assumed that each technical study and CEQA and NEPA document <br />would cover both Project Phases. However, because Phases 3 and 4 of the Project are geographically <br />separated and not dependent on each other to operate as intended, Caltrans may ultimately require <br />preparation of separate technical studies and requisite CEQA (i.e., Addendum) and NEPA (Re - <br />Validation) documentation for each respective Project Phase. Likewise, the City may find it <br />beneficial to prepare separate studies for each Phase of the Project such that an unforeseen delay on <br />one Phase does not also delay processing and approval of the other Phase. URS will, to the extent <br />possible, prepare studies for each Phase in parallel so as to realize efficiencies in effort. This will <br />include, but not necessarily be limited to, conducting background research and fieldwork for each <br />study simultaneously. It is anticipated that the same lead technical staff member from URS would <br />author the same study for both Phases of the Project so as to maintain reporting consistency and to <br />realize efficiencies in effort. <br />Task 4. Preparation of Additional Traffic Analyses for Each Phase 3 and 4 <br />URS has been directed to perform out -of -scope traffic analyses not otherwise included in our <br />originally submitted proposal. This includes performing a traffic signal synchronization analysis for <br />both Phases 3 and 4 using Caltrans' Highway Capacity Manual methodology; this analysis will be <br />included in memorandum report format and appended to each Phase's respective Traffic Impact <br />Analysis. Caltrans has also directed URS to include the Bristol Street/Edinger intersection as part of <br />the Phase 4 Traffic Impact Analysis; URS did not anticipate needing to perform an analysis for this <br />particular intersection as part of it's originally approved scope of work for this project. <br />The total fee proposal, including the tasks described above for Addendum No. 1, is $235,815.00; this <br />represents an increase of $65,530.00 above the originally submitted fee proposal. The detailed fee <br />proposal is enclosed for your reference. As you will see, the bulk of the additional work would be <br />incurred as a result of preparing separates technical studies and CEQA and NEPA documents for <br />each respective phase of the Project. <br />If you have any questions regarding the enclosed Amendment request, please call me at (714) 433- <br />7603. <br />Sincerely, <br />URS CORPORATION <br />Court Mo an <br />Project Manager <br />Enclosure: Fee Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.