My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
URS CORPORATION AMERICAS 7b
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2018
>
URS CORPORATION AMERICAS 7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:53:21 PM
Creation date
6/3/2010 11:48:30 AM
Metadata
Fields
Template:
Contracts
Company Name
URS CORPORATION AMERICAS
Contract #
A-2008-141-001
Agency
PLANNING & BUILDING
Expiration Date
12/31/2011
Insurance Exp Date
5/1/2011
Destruction Year
2018
Notes
Amends A-2007-169, A-2008-141 Amended by A-2008-141-002, -03
Document Relationships
URS CORPORATION 7 (2)
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7a
(Amends)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7c
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
URS CORPORATION AMERICAS 7d
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR PROPOSAL <br />ENVIRONMENTAL DOCUMENT FOR THE WIDENING OF BRISTOL STREET <br />PHASE 3 (FROM CIVIC CENTER DRIVE TO SEVENTEENTH STREET) <br />PHASE 4 (FROM WARNER AVENUE TO SAINT ANDREW PLACE) <br />I. INTRODUCTION <br />The City of Santa Ana Public Works Agency desires to utilize the services of a qualified consulting <br />engineering firm for the preparation of environmental compliance documentation for the Bristol <br />Street widening project from Civic Center Drive and Seventeenth Street (Phase 3) and from Warner <br />Avenue to Saint Andrew Place (Phase 4). The major elements of the project are: <br />Update the environmental compliance documents for California Environmental Quality Act <br />(CEQA). <br />Update the environmental compliance documents for National Environmental Policy Act <br />(NEPA). <br />The limits of the project are shown in Exhibit I. <br />II. PROJECT BACKGROUND <br />Bristol Street between Warner Avenue and Memory Lane from a four -lane roadway to a six -lane <br />arterial to provide adequate vehicular capacity within the City's northing limits. In 1990, the <br />Environmental Impact Statement (EIS) pursuant of the National Environmental Policy Act (NEPA) <br />and Environmental Impact Report (EIR) pursuant to the California Environmental Quality Act <br />(CEQA) were approved for the widening of the 3.9-mile section of the Bristol Street Corridor from <br />Warner Avenue to Memory Lane. In 1991, City Council adopted the 3.9-mile improvement as the <br />Bristol Street Corridor Specific Plan. <br />The following documents and files are available on the attached compact disc: <br />A. Bristol Street Widening EIS/EIR (1990) Willdan Associates <br />- Bristol Widening EIS-EIR.pdf <br />B. Bristol Street Widening Technical Studies (1990) by Endo Engineering <br />- Air Quality and Noise Assessments <br />- Bristol Widening Technical Studies.pdf <br />C. Traffic Study for Bristol Street Specific Plan (1991) by DKS Associates <br />- Bristol Widening Traffic Study.pdf <br />D. Bristol Street Widening Project Traffic Impact Analysis Memory Lane to First Street (1987) <br />by Willdan Associates <br />- Bristol Widening Traffic Impact Analysispdf <br />
The URL can be used to link to this page
Your browser does not support the video tag.