My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - PROPOSED BUDGET & MISC FEES FY 2010-11
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
75A - PH - PROPOSED BUDGET & MISC FEES FY 2010-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:03:36 PM
Creation date
6/3/2010 12:19:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/7/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> RESOLUTION 2010 <br /> PROPOSED <br /> <br /> REVENUE FY 09-10 FY 10-ll <br /> <br /> ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br /> SECTION IX PLANNING & BUILDING AGENCY <br /> Up to and including 1 HP, KW, KVA each Each 4.25 4.25 <br /> Over 1 and not over 10 HP, KW, KVA each Each 10.95 10.95 <br /> Over 10 and not over 50 HP, KW, KVA each Each 22.25 22.25 <br /> Over 50 and not over 100 HP, KW, KVA each Each 47.65 47.65 <br /> Over 100 and not over 500 HP, KW, KVA each Each 63.50 63.50 <br /> Over 500 HP, KW, KVA each Each 79.30 79.30 <br /> 51603 19) Demolition, per project Per Project 30.80 30.80 <br /> 51603 20) Inspections outside of normal business hours (four hour <br /> minimum charge for Holidays, Saturday or Sunday Per Hour 79.30 79.30 <br /> inspections) <br /> 51603 21) Re-inspection fee assessed under applicable provisions <br /> of the Building Code Per Hour 79.30 79.30 <br /> 51603 22) Inspections for which no fee is specifically <br /> indicated (minimum charge -one (1) hour) Per Hour 79.30 79.30 <br /> 53601 23) Additional plan review required by changes, additions, or <br /> revisions to approved plans (minimum charge -one (1) hour) Per Hour 79.30 79.30 <br /> ELECTRICAL PLAN CHECK FEES <br /> Whenever electrical plans are required by the Building <br /> Official, plan check fees shall be 65% of the electrical <br /> permit fee and shall be paid at the time of submitting plans. <br /> 51604 MECHANICAL CODE <br /> Any person desiring a permit required by the Mechanical Each Permit 37.85 37.85 <br /> Code shall, at the time of filing an application, pay a fee <br /> of $6.55 towards the State Mandated Training Program <br /> and pay a fee equal to X31.30 plus the sum of the fees for the <br /> work to be done under the permit as set forth in the following <br /> schedule. There is no minimum fee for the issuance of a <br /> permit for single family residences and duplexes. The <br /> minimum total fee for issuance of a permit for all other uses <br /> shall be X61.80. 61.80 61.80 <br /> Note: A mechanical Code permit fee is separate from and <br /> additional to the fee for any other permit which maybe <br /> required by Code provisions other than the Mechanical <br /> Code. <br /> 42 <br /> 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.