My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - PROPOSED BUDGET & MISC FEES FY 2010-11
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
75A - PH - PROPOSED BUDGET & MISC FEES FY 2010-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:03:36 PM
Creation date
6/3/2010 12:19:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/7/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> RESOLUTION 2010 <br /> PROPOSED <br /> <br /> REVENUE FY 09-10 FY 10-ll <br /> <br /> ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br /> SECTION IX PLANNING & BUILDING AGENCY <br /> FEE SCHEDULE <br /> 51604 1) For the installation or relocation of each forced-air or <br /> gravity-type furnace or burner, including ducts and <br /> vents attached to such appliance, up to and including Each 27.60 27.60 <br /> 100,000 BTU/h <br /> 51604 2) For the installation or relocation of each forced-air <br /> or gravity-type furnace or burner, including ducts <br /> and vents attached to such appliance over 100,000 BTUIh Each 39.40 39.40 <br /> 51604 3) For the installation or relocation of each boiler, compressor, <br /> condensing unit or heat pump up to and including five <br /> horsepower, or each absorption system to and including <br /> 100,000 BTUIh Each 47.65 47.65 <br /> 51604 4) For the installation or relocation of each boiler, <br /> compressor, condensing unit or heat pump over five <br /> horsepower up to and including 30 horsepower or <br /> for each absorption system over 100,000 BTUIh up <br /> to and including 1,000,000 BTUIh Each 47.65 47.65 <br /> 51604 5) For the installation, relocation of each boiler, compressor, <br /> condensing unit or heat pump over 29 horsepower up to and <br /> including 50 horsepower or for each absorption system over <br /> 1,000,000 BTUIh up to and including 1,750,000 BTUIh Each 57.85 57.85 <br /> 51604 6) For the installation or relocation of each boiler, compressor, <br /> condensing unit or heat pump over 49 horsepower, or each <br /> absorption system over 1,750,000 BTUIh Each 79.30 79.30 <br /> 51604 7) For each VAV control box or air handling <br /> unit to and including 2,000 cubic feet per minute, <br /> including ducts attached thereto Each 18.75 18.75 <br /> 51604 8) For each VAV or air-handling unit over 2,000 cfm Each 27.60 27.60 <br /> Note: This fee shall not apply to an air-handling <br /> unit which is a portion of a factory assembled <br /> appliance, cooling unit, evaporative cooler or <br /> absorption unit for which a permit is required else <br /> where in this code. <br /> 51604 9) Outdoor dual packaged heating and cooling Each 47.65 47.65 <br /> 51604 10) For the installation or relocation of each floor <br /> furnace, including vent Each 27.60 27.60 <br /> 51604 11) For the installation or relocation of each suspended <br /> heater, recessed wall heater orfloor-mounted unit heater Each 27.60 27.60 <br /> 51604 12) Decorative fireplace Each 27.60 27.60 <br /> 43 <br /> 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.