My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH - PROPOSED BUDGET & MISC FEES FY 2010-11
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
75A - PH - PROPOSED BUDGET & MISC FEES FY 2010-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:03:36 PM
Creation date
6/3/2010 12:19:39 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/7/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> RESOLUTION 2010 <br /> PROPOSED <br /> <br /> REVENUE FY 09-10 FY 10-ll <br /> <br /> ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br /> SECTION IX PLANNING & BUILDING AGENCY <br /> (k) Humidifier. <br /> (1) Duct heater. <br /> (m) Condensate Pumps <br /> (n) Etcetera. <br /> 51604 24) For the installation, relocation or replacement of each <br /> appliance "vent" installed and not included in an appliance Each 27.60 27.60 <br /> permit <br /> 51604 25) Each process piping system Each 79.30 79.30 <br /> 51604 26) For each ventilation system which is not a portion of any <br /> heating orair-conditioning system authorized by permit Each 79.30 79.30 <br /> (a) Halon exhaust system. <br /> (b) Wood sawdust collection system or similar collection <br /> system (paper, plastic, metal filings, etc.) <br /> (c) Smoke evacuation and exhaust system for public <br /> buildings, atrium, malls, etc. <br /> (d) Crematory furnace and exhaust system. <br /> (e) Each other product conveying duct system: <br /> (1) Flammable vapors <br /> (2) Fumes <br /> (3) Smoke <br /> (4) Heat <br /> 51604 27) For the installation or relocation of each domestic- <br /> typeincinerator Each 18.75 18.75 <br /> (Shall have permit and approval from S.C.A.Q.M.D.) <br /> 51604 28) For the installation or relocation of each commercial <br /> or industrial-type incinerator Each 79.30 79.30 <br /> (Shall have permit and approval from S.C.A.Q.M.D.) <br /> 51604 29) Inspections outside of normal business hours <br /> (4 hour minimum charge for Holidays, Saturday or <br /> Sunday inspections) Per Hour 79.30 79.30 <br /> 51604 30) Re-inspection fee assessed under applicable provisions <br /> of the Building Code Per Hour 79.30 79.30 <br /> 51604 31) Inspections for which no fee is specifically indicated <br /> (minimum charge -one (1) hour) Per Hour 79.30 79.30 <br /> 51604 32) Additional plan review required by changes, additions <br /> or revisions to approved plans (minimum charge -one (1) hour) Per Hour 79.30 79.30 <br /> MECHANICAL PLAN CHECK FEES <br /> Whenever mechanical plans are required by the Building <br /> Official, plan check fees shall be 65% of the mechanical <br /> permit fee and shall be paid at the time of submitting plans <br /> 45 <br /> 7 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.