Laserfiche WebLink
<br /> RESOLUTION 2010 <br /> PROPOSED <br /> <br /> REVENUE FY 09-10 FY 10-ll <br /> <br /> ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br /> SECTION IX PLANNING & BUILDING AGENCY <br /> 51602 30) Temporary Gas Service Each 198.80 198.80 <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000.00 cash or cashier's check for each service meter. <br /> This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br /> 51602 31) Inspections outside of normal business hours (4 hour <br /> minimum charge for Holidays, Saturday or Sunday Per Hour 79.30 79.30 <br /> inspections). <br /> 51602 32) Re-inspection fee assessed under applicable provisions <br /> of the Building Code Per Hour 79.30 79.30 <br /> 51602 33) Inspections for which no fee is specifically indicated <br /> (minimum charge -one (1) hour) Per Hour 79.30 79.30 <br /> 51602 34) Additional plan review required by changes, additions or <br /> revisions to approved plans (minimum charge -one (1) hour) Per Hour 79.30 79.30 <br /> PLUMBING PLAN CHECK FEES <br /> Whenever plumbing plans are required by the Building <br /> Official, plan check fees shall be 65% of the plumbing <br /> permit fee and shall be paid at the time of submitting plans. <br /> GRADING PERMITS <br /> 51606 Any person desiring a grading permit required by the Building Each Permit 37.85 37.85 <br /> Code, shall, at the time of filing an application, pay a fee of 56.55 <br /> towards the State Mandated Training Program and pay a fee <br /> equal to 531.30 plus the sum of the fees for the work to be done. <br /> under the permit as set forth in the following schedule: <br /> (Note: A grading permit fee is separate from and additional <br /> to the fees for any other permit which maybe <br /> required by code provisions.) <br /> FEE SCHEDULE <br /> Minimum <br /> 51606 1) Grading Permit: Per Hour 79.30 79.30 <br /> a. One and Two S.F.D. 1 Hour <br /> b. Multiple Residential including, Residential tracts, <br /> Apartments, Condominiums, Hotels, Motels, and <br /> Similar Construction 2 Hours <br /> c. Non-Residential Site Less Than 2 Acres 3 Hours <br /> d. Non-Residential Site 2 Acres and More 5 Hours <br /> e. Preliminary Grading Permit, Underground Tank <br /> Removal and Excavation for Soil Contamination 1 Hour <br /> f. Existing Parking Lot Resurfacing and Repainting 1 Hour <br /> 48 <br /> 7 7 <br /> <br />