Laserfiche WebLink
<br /> RESOLUTION 2010 <br /> PROPOSED <br /> <br /> REVENUE FY 09-10 FY 10-ll <br /> <br /> ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br /> SECTION IX PLANNING & BUILDING AGENCY <br /> 51606 2) In addition to the above noted permit fees, <br /> a fee shall be collected for new site improvements, <br /> new parking lots, new concrete curb and gutter, and <br /> asphalt paving Sq. Ft. 0.03 0.03 <br /> Minimum <br /> 51606 3) Inspections outside of normal business hours <br /> (4 hour minimum charge for Holidays, Saturday <br /> or Sunday inspections) Per Hour 79.30 79.30 <br /> 51606 4) Re-inspection fee assessed under applicable <br /> provisions of the Building Code Per Hour 79.30 79.30 <br /> 51606 5) Inspections for which no fee is specifically <br /> indicated (minimum charge -one (1) hour) Per Hour 79.30 79.30 <br /> SOLAR ENERGY CODE <br /> 51611 Any person desiring a permit required by the Solar Energy Each <br /> Code shall, at the time of filing an application, pay a fee of Permit 37.85 37.85 <br /> $6.55 towards the State Mandated Training Program and <br /> a fee equal to $31.30 plus the sum of the fees for the work to <br /> be done under the permit as set forth in the following <br /> schedule. There is no minimum fee for the issuance of a <br /> permit for single family residences and duplexes. The <br /> minimum total fee for issuance of a permit for all other uses <br /> shall be X61.80. 61.80 61.80 <br /> (NOTE: These fees do not include permit fees for any <br /> parts of the solar energy system which are subject to the <br /> requirements of other applicable codes.) <br /> FEE SCHEDULE <br /> 51611 1) For collectors (including related piping and <br /> regulating devices): <br /> Up to 1,000 sq. ft. (93m~) 9.35 9.35 <br /> Between 1,001(93.1m) and 2,000 sq. ft. (186m~) 15.80 15.80 <br /> More than 2,000 sq. ft. (18m~) 15.80 15.80 <br /> plus per 1,000 sq.ft. (93m2) or fraction 1.65 1.65 <br /> thereof over 2,000 sq. ft. (186rri ) <br /> 51611 2) For storage tanks (including related piping and <br /> regulating devices): <br /> Up to 750 gallons (3m) 8.00 8.00 <br /> Between 751(3m3) and 2,000 gallons 14.40 14.40 <br /> 49 <br /> 7 <br /> <br />