Laserfiche WebLink
Chapter 1 Introduction <br />The key pro c ducal actions related to the CEQA proccss for the Transit Zo ng Code and the Developer <br />Project include: <br />■ Circulate Initial Std /Notice of Preparation o dad's) July 20, 2006- August 22, 2006 <br />n Filed NOC and Circulated Draft EIR February , 2010 <br />m Conducted Scoping Meeting at February 22, 2010 Planning Coy t isslon Meeting <br />n Re-Circulated Alternatives Section /extended DEIR re- vie -tv, period, February 24, 2010 -- April 12, <br />2010 <br />n Conduc ted S coping Allee ti g at 1\11a rch 22, 2010 Phi ng Conin ssion Alleeting <br />Transit Zoning Code (D 4 ) EIR Findings of Fact/Statement of Overriding Considerations <br />-Code -Potential Net <br /># a : � V6100 .::: :. � s , o.. e. o rf f .:`: # a Vie# <br />c .t .::...:: <br />e ide ` l (units) <br />41272 <br />197 <br />075 <br />Retail sf <br />693* 00 <br />306300 <br />337 }000 <br />Industrial (sQ <br />00x000 <br />1;0803000 <br />(990,000) <br />Commercial (sQ <br />0 <br />12000 <br />(124,000) <br />[l <br />81000 <br />29,000 <br />X000) <br />Open Space (sQ <br />680,000 <br />0 <br />68O,0O <br />Surface Parking Lot (so <br />67,000 <br />11030x00 <br />(1,7721030) <br />The key pro c ducal actions related to the CEQA proccss for the Transit Zo ng Code and the Developer <br />Project include: <br />■ Circulate Initial Std /Notice of Preparation o dad's) July 20, 2006- August 22, 2006 <br />n Filed NOC and Circulated Draft EIR February , 2010 <br />m Conducted Scoping Meeting at February 22, 2010 Planning Coy t isslon Meeting <br />n Re-Circulated Alternatives Section /extended DEIR re- vie -tv, period, February 24, 2010 -- April 12, <br />2010 <br />n Conduc ted S coping Allee ti g at 1\11a rch 22, 2010 Phi ng Conin ssion Alleeting <br />Transit Zoning Code (D 4 ) EIR Findings of Fact/Statement of Overriding Considerations <br />