Laserfiche WebLink
Chapter 13 TEXT CHANGES <br />• Post- Tanuaa 1. 2015: All off road diesel powmd construction eaur e greater than 50 h� <br />shall meet the Tier 4 emission standards, where available. In addition, all construction eauihment <br />shall be ouifatted with BACT devices cen ifaed by California ARB. Any emissions control device <br />used by the contractor shall achieve emissions reductions that are no less than what could be <br />achieved by a Level 3 diesel emissions control stratea for a similarly sized engine as de aned by <br />Cali orma AKB renula • A cov of each unit's certi zed tier she a zcation. BACT documentation, and California AKB or <br />AOMD rrherating permit shall he provided at the time of mobilization of each aip icable unit of <br />13 -6 City of Santa Ana Transit Zoning Code (SD 84A and SD 84B) EIR <br />