My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - MISC FEE SCHEDULE FY 2010-11 - EXHIBIT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
75A - MISC FEE SCHEDULE FY 2010-11 - EXHIBIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:03:32 PM
Creation date
6/23/2010 12:02:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/7/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2010-023 <br />REVENUEFY 10-11 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br /> 598 volts or less, 1200 amps and over.Each Meter159.15 <br />516039) Signs and high-potential gas tube lighting, eachEach31.60 <br /> Note:This shall include all necessary control equipment <br />5160310) Swimming pool, fountain, spas, eachEach69.90 <br />5160311) Above ground spasEach22.50 <br />5160312) Temporary power- construction: <br /> For services supplying a temporary power pole, <br /> pedestal or piggybackEach54.95 <br /> For a system of distribution and utilization of poles <br /> for temporary construction power, each poleEach Pole10.45 <br />5160313) Temporary construction lighting: <br /> 500 lamps or less4.70 <br /> Over 500 lamps8.20 <br />5160314) Temporary services: <br /> At the time of application for temporary power, the owner <br /> shall post a $1,000.00 cash or cashier's check conforming to the <br /> Santa Ana Municipal Code Section 8-1768 for each service <br /> meter. This deposit shall be released upon request after the <br /> Certificate of Completion or Certificate of Occupancy is issued. <br /> Temporary electric service prior to final approval or <br /> occupancy, each meterEach Meter198.80 <br /> Temporary work with service, each meterEach Meter27.80 <br />5160315) Lighting standards: <br /> With one (1) fixture eachEach10.45 <br /> Each additional fixture on the same standardEach3.00 <br />5160316) Time clock or photo electric cell, eachEach8.20 <br />5160317) Radiant ceiling heat per roomPer Room10.45 <br />5160318) Power apparatus: generators, motors, transformers, <br /> rectifiers, synchronous converters, capacitors, <br /> industrial heating, cooking or baking equipment, and <br /> other apparatus as follows: <br /> (Ratings - horsepower (HP), kilowatts (KW), and <br /> Kilovolt amps (KVA)) <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.