My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - MISC FEE SCHEDULE FY 2010-11 - EXHIBIT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2010
>
06/07/2010
>
75A - MISC FEE SCHEDULE FY 2010-11 - EXHIBIT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 4:03:32 PM
Creation date
6/23/2010 12:02:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
75A
Date
6/7/2010
Destruction Year
2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2010-023 <br />REVENUEFY 10-11 <br />ACCOUNTDEPARTMENT/MISCELLANEOUS FEE OR SERVICEUNITFEES <br />SECTION IXPLANNING & BUILDING AGENCY <br /> Up to and including 1 HP, KW, KVA eachEach4.25 <br /> Over 1 and not over 10 HP, KW, KVA eachEach10.95 <br /> Over 10 and not over 50 HP, KW, KVA eachEach22.25 <br /> Over 50 and not over 100 HP, KW, KVA eachEach47.65 <br /> Over 100 and not over 500 HP, KW, KVA eachEach63.50 <br /> Over 500 HP, KW, KVA eachEach79.30 <br />5160319) Demolition, per projectPer Project30.80 <br />5160320) Inspections outside of normal business hours (four hour <br /> minimum charge for Holidays, Saturday or Sunday Per Hour79.30 <br /> inspections) <br />5160321) Re-inspection fee assessed under applicable provisions <br /> of the Building CodePer Hour79.30 <br />5160322) Inspections for which no fee is specifically <br /> indicated (minimum charge - one (1) hour)Per Hour79.30 <br />5360123) Additional plan review required by changes, additions, or <br /> revisions to approved plans (minimum charge - one (1) hour) Per Hour79.30 <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />51604MECHANICAL CODE <br />Any person desiring a permit required by the MechanicalEach Permit37.85 <br />Code shall, at the time of filing an application, pay a fee <br />of $6.55 towards the State Mandated Training Program <br />and pay a fee equal to $31.30 plus the sum of the fees for the <br />work to be done under the permit as set forth in the following <br />schedule. There is no minimum fee for the issuance of a <br />permit for single family residences and duplexes. The <br />minimum total fee for issuance of a permit for all other uses <br />shall be$61.80.61.80 <br />Note: A mechanical Code permit fee is separate from and <br /> additional to the fee for any other permit which may be <br /> required by Code provisions other than the Mechanical <br /> Code. <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.