My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
F.T. ZIEBARTH COMPANY
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
F.T. ZIEBARTH COMPANY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:01:19 PM
Creation date
6/24/2010 12:53:37 PM
Metadata
Fields
Template:
Contracts
Company Name
F. T. Ziebarth Company
Contract #
05-3195
Agency
Public Works
Council Approval Date
6/21/2010
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 05-3105 <br />RFA Change Order No. 1 <br />May 10, 2011 <br />Page 2 <br />corrosion within the tank. Therefore it is recommended to provide temporary power to <br />the SCADA system and relocate the cathodic system within the new building. <br />AGREED COST = $3,170.00 <br />3. While removing and relocating the power cables to Well No. 21 the cable insulation was <br />observed to have excessive cracking. Therefore it is recommended to replace 2100 feet <br />of power cable and 8000 feet of control wiring to Well No. 21 . <br />AGREED COST = $27,146.00 <br />4. While reviewing the parking lot to repair the trenches, the entire parking lot was <br />observed to be in very poor condition. Therefore it is recommended to repave the entire <br />parking lot. <br />AGREED COST = $89,491 .00 <br />5. The Water Department requested to install a new sewer line, 85 If, to the new building <br />for a future chlorination testing system. <br />AGREED COST = $3,481 .00 <br />6. While reviewing to repave the parking lot it was observed that the existing catch basin <br />and 8 If of curb and gutter was too high and water was unable to drain properly from the <br />site. Therefore it is recommended to lower the catch basin and replace the curb and <br />gutter. <br />AGREED COST = $3,208.00 <br />7. The Water Department determined that the interior walls and ceiling did not require <br />painting. Therefore, they requested to delete the painting of the interior walls and ceiling <br />of the new building. <br />AGREED CREDIT = <$10,655.00> <br />? A?{APPROVED AS TO FUNDS AND ACCOUNTS: <br />CC\R? ? Z? n ? 1 ? .a?? <br />Raul Godinez, II Francisco Gutierrez <br />Executive Director Executive Director <br />Public Works Agency Finance and Management Services Agency <br />JGR/DI/MG/OS-3'195 RFA CO 1
The URL can be used to link to this page
Your browser does not support the video tag.