Laserfiche WebLink
-:? <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 05-3195 -WEST PUMP STATION FACILITIES UPGRADES Change Order Number 1 <br />To F.T. Ziebarth Company Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work no[ included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by Pl IRI IC W[7RKR Ar;FNRY <br />EXTRA WORK AT AGREED PRICE <br />1. Shorten the five vertical turbine pump shafts per PCO #1 . <br />AGREED PRICE _ $5,684.00 <br />2. Provide and install temporary power to the SCADA system and relocate the cathodic protection <br />system per PCO #2. <br />3. Provide and install new wire to Well No_ 21 per PCO #21. <br />AGREED PRICE _ $3,170.00 <br />AGREED PRICE _ $27,146.00 <br />4. Demo two existing PCC pads and the existing chain link fence, install a new PCC pad, anchor the <br />existing conduit to the wall, and cold mill and pave the entire parking lot per PCO #4. <br />5. Provide and install a new sewer to the building per PCO #6. <br />AGREED PRICE _ $89,49'1 _00 <br />AGREED PRICE _ $3,481.00 <br />6. Lower the existing catch basin and replace the curb and gutter per PCO #7. <br />AGREED PRICE _ $3,208.00 <br />DELETED WORK AT AGREED CREDIT <br />7. Delete the painting of the building interior walls and ceiling per PCO #5. <br /> <br /> <br />AGREED CREDIT = <$10,655.00> <br />Page 1 of 2