Laserfiche WebLink
representatives to ultimately confirm the type and location of noise abatement the church would <br />require for project approval. The results of the coordination are detailed in the project's NADR. <br />Task 5. Update Traffic Impact Analysis <br />Per Caltrans' e-mail direction dated March 8, 2010, the Traffic Impact Analysis needs to be <br />updated / remodeled for the year 2035 using a straight-line projection method using a City - <br />approved traffic growth factor. It is assumed that the existing year will remain as 2008. The text <br />of the existing Traffic Impact Analysis will be updated as necessary. It is assumed that the City <br />and Caltrans will review the updated report concurrently, and Caltrans will require a maximum <br />of one round of revisions to approve this study. It is also assumed that a total of no more than 10 <br />copies of the revised traffic impact analysis will need to be reproduced. <br />Task 6. Update Noise Analysis <br />Utilizing the results of the updated Traffic Impact Analysis, a memorandum will prepared that <br />qualitatively documents that the results of the updated traffic analysis (e.g., changes in volumes) <br />will not affect the already performed impact analyses and mitigation (abatement) requirements. <br />The memorandum will be reviewed concurrently by the City and Caltrans. This scope of work <br />does not include updating the Caltrans approved Noise Study Report or Noise Abatement <br />Decision Report above and beyond changing the project description in each report. Therefore, it <br />is assumed that Caltrans will not perform a formal round of review of either one of the <br />aforementioned noise studies as part of updating the noise analysis. It is also assumed that a total <br />of no more than 10 copies of the noise impact analysis memorandum will need to be reproduced. <br />Task 7. Air Quality Conformity Finding — Southern California Association of Governments <br />Coordination <br />The project will be re -presented to the Southern California Association of Governments' <br />Transportation Conformity Working Group utilizing the traffic data generated as a result of the <br />updated Traffic Impact Analysis (see Task 5). URS will coordinate directly with SCAG's TCWG <br />to agendize the project to confirm that it is not a Project of Air Quality Concern. If deemed <br />necessary, Caltrans will request an updated conformity determination from the Federal Highway <br />Administration. This scope of work does not include updating the Caltrans approved Air Quality <br />Study or Air Quality Conformity Analysis above and beyond changing the project description in <br />each report. Therefore, it is assumed that Caltrans will not perform a formal round of review of <br />either one of the aforementioned air quality studies. It is also assumed that a total of no more <br />than 5 copies each of the Air Quality Study or Air Quality Conformity Analysis that include the <br />revised project description. <br />Task 8. Update Other Technical Studies <br />This task includes updating the project descriptions in the technical studies not otherwise <br />described above. This includes the Relocation Impact Statement; Community Impact <br />Assessment; Historic Property Survey Report and Historic Resources Evaluation Report; and <br />Natural Environment Study (Minimal Impacts). It is assumed that revisions to the project <br />description write-ups of these technical studies will not require a formal round of review by <br />4 <br />