Laserfiche WebLink
RESOLUTION 2010-023 <br />REVENUE FY 70-17 <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES <br />SECTION IX PLANNING 8c BUILDING AGENCY <br />Projects prior to May I8, 2009, shol/ be subject to the fees indicated in Resolution 2009-018 <br />51606 2) In addition to the above noted permit fees, <br /> a fee shall be collected for new site improvements, <br /> new parking lots, new concrete curb and gutter, and <br /> asphalt paving Sq_ Ft_ 0.03 <br /> Minimum <br />51606 3) Inspections outside of normal business hours <br /> (4 hour minimum charge for Holidays, Saturday <br /> or Sunday inspections) Per Hour 79.30 <br />51606 4) Re-inspection fee assessed under applicable <br /> provisions of the Building Code Per Hour 79.30 <br />51606 5) Inspections for which no fee is speci£cally <br /> indicated (minimum charge -one (1) hour) Per Hour 7930 <br /> SOLAR ENERGY CODE <br />51611 Any person desiring a permit required by [he Solar Energy Each <br /> Code shall, at the Lme of filing an application, pay a fee of Permit 37.85 <br /> $6.55 towards [he State Mandated Training Program and <br /> a fee equal to $37.30 plus the sum of the fees for the work [o <br /> be done under the permit as set forth in [he following <br /> schedule. There is no minimum fee for the issuance of a <br /> permit for single family residences and duplexes. The <br /> minimum total fee for issuance ofa permit for all other uses <br /> shall be $61 .80. 61 .80 <br /> (NOTE: These fees do not include permit fees For any <br /> parts of the solar energy system which are subject [o the <br /> requirements of other applicable codes-) <br /> FEE SCHEDULE <br />51611 1) For collectors (including related piping and <br /> regulating devices)' <br /> Up to 1,000 sq. ft. (93m') 935 <br /> Between 1,001 (93.1m~) and 2,000 sq_ ft_ (186m') 15.80 <br /> More than 2,000 sq. ft. (18m ~) 15.80 <br /> plus per 1,000 sq.ft. (93m2) or fraction 1.65 <br /> thereof over 2,000 sq_ ft. (186m~) <br />51611 2) For storage tanks (including related piping and <br /> regulating devices): <br /> Up to 750 gallons (3m3) 8.00 <br /> Between 751 (3m3) and 2,000 gallons 14.40 <br />48 <br />