Laserfiche WebLink
Ms.Heidi Jacinto,Assistant Planner 11 <br /> City of Santa Ana <br /> 11/07/2024 <br /> Page 2 of 5 <br /> Ardurra is submitting this proposal to provide peer review of the applicant's materials. This proposal includes <br /> a description of the scope of work, schedule/timeline of reviews, assigned staff and qualifications, fees, <br /> attendance and availability for in-person or virtual meetings as requested in the City's Request for Proposal. <br /> Our proposed scope of work is described in the following section. Ardurra's scope of work is only for peer <br /> review and excludes additional analysis and processing. Ardurra's proposed scope of work will be managed <br /> by Ms. Lori Trottier, AICP CEP from Ardurra's Newport Beach office, located 4 miles (14 minutes) from City <br /> Hall. Throughout the duration of the contract, Ms. Troffier will be available by telephone, in-person meetings, <br /> or virtual meetings. <br /> SCOPE OF WORK <br /> TASK 1: NOTICE TO PROCEED AND KICK-OFF <br /> Upon completion of contract documents and issuance of notice to proceed from the City, Ardurra will prepare <br /> for and attend a kick-off meeting. This task includes either in-person or virtual meeting attendance and <br /> preparation of a meeting agenda and updated schedule for use at the meeting as well as and meeting minutes <br /> following the meeting. The meeting minutes will be disseminated to all attendees for review and comment. <br /> Ardurra anticipates receiving and addressing one (1) round of comments and edits. <br /> TASK 2: REVIEW OF TECHNICAL STUDIES AND CEQA CONSISTENCY MEMO <br /> Upon our receipt of the applicant's technical studies and CEQA Consistency Memo, Ardurra and our <br /> subconsultants will begin peer review. Peer review will look at assumptions for analysis, and report conclusions <br /> regarding project consistency with applicable City ordinances, previous analysis, and CEQA Statute and <br /> Guidelines. Ardurro's environmental team will verify the accuracy and conclusions of the applicants reports on <br /> traffic, air quality/GHG, health risk, noise, and CEQA Consistency Memo as follows: <br /> o Verify project description, assumptions and data for consistency with application materials. <br /> o Verify adequate description of existing conditions. <br /> o Verify consistency between baseline conditions of the previous analysis and existing conditions. <br /> o Review project consistency with the Metro East Mixed-Use Overlay District Expansion and Elan <br /> Development Projects Subsequent EIR (June 2018) ["MEMU SEIR"] and determine if <br /> additional analysis or mitigation measures are necessary for compliance with CEQA. <br /> o Verify the adequacy of analysis methodology, assumptions, approach, modeling, <br /> recommended mitigation, and level of significant impacts for consistency with CEQA. <br /> TASK 3: SUMMARY MEMORANDUM OF FINDINGS <br /> Ardurra will prepare a technical memorandum for City use that summarizes the peer review findings from Task <br /> 2 for each technical study and the CEQA Consistency Memo. Ardurra's environmental team will review a <br /> second submittal and prepare a letter to confirm any comments noted in the initial peer review are adequately <br /> addressed. Separate stand-alone memos will be attached as an appendix for each technical study. <br /> 3737 Birch Street Suite 250 1 Newport Beach, CA 92660 1 949.235.3094 1 www.ardurro.corn <br />