Laserfiche WebLink
Ms. Lori Trottier, Environmental Lead <br /> ARDURRA GROUP, INC. <br /> October 28, 2024 <br /> (see MM-OZ 4.12-4),Accordingly,this scope of work does not include detailed peer review of Level of <br /> Service analysis. <br /> ■ Review adequacy of the vehicle miles traveled(VMT)assessment for compliance with CEQA.This scope <br /> of work assumes the project's VMT assessment will tier from the previously certified MEMU SEIR. <br /> ■ Prepare a technical memorandum that documents the peer review findings and comments. If necessary, <br /> review a second submittal and prepare a second letter to confirm any comments noted in the initial <br /> peer review are adequately addressed. <br /> Task 2 Noise Study Peer Review <br /> Ganddini Group shall perform a peer review of the Noise Study report for the proposed project consisting of <br /> the following tasks: <br /> ■ Verify that the noise study provides an adequate description of the existing conditions. <br /> ■ Review the modeling, the analysis and any mitigation recommended related to potential noise and <br /> vibration impacts to adjacent land uses as a result of project construction. <br /> ■ Review the modeling, the analysis and any mitigation recommended for potential noise impacts to off- <br /> site receptors due to project generated vehicle traffic. <br /> ■ Review the modeling, the analysis and any mitigation recommended for potential transportation noise <br /> impacts to the proposed project. <br /> ■ Review the modeling,the analysis and any mitigation recommended for potential noise impacts to off- <br /> site receptors due to project operation, <br /> ■ Prepare a technical memorandum that documents the peer review findings and comments. If necessary, <br /> review a second submittal and prepare a second letter to confirm any comments noted in the initial <br /> peer review are adequately addressed. <br /> Task 3 Air Quality, Greenhouse Gas,and Health Risk Assessment Peer Review <br /> Ganddini Group shall perform a peer review of the Air Quality, Greenhouse Gas, and Health Risk Assessment <br /> (HRA) reports)for the proposed project consisting of the following tasks: <br /> Air Quality Impact Analysis Technical Study Review <br /> ■ Review of air quality analysis technical study methodology, approach and assumptions to ensure that <br /> the technical analyses are adequate and accurate for use in the CEQA document, meet the <br /> requirements of the SCAQMD and are in accordance with CEQA. <br /> Review of the project description, project assumptions and project data to ensure that the air quality <br /> analysis is based on a project that is substantially consistent with that presented to the City for review <br /> and to ensure that all potential impacts are identified and addressed. <br /> n�j <br /> gii <br /> Consulting Services Proposal for <br /> Meritage Homes(2020 E.First Street) <br /> 2 Proposal No.p20453 <br />