My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ECS PACIFIC, INC.
Clerk
>
Contracts / Agreements
>
E
>
ECS PACIFIC, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 10:28:23 AM
Creation date
5/28/2025 8:40:07 AM
Metadata
Fields
Template:
Contracts
Company Name
ECS PACIFIC, INC.
Contract #
N-2025-136
Agency
Library
Expiration Date
6/30/2026
Insurance Exp Date
12/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECS Pacific, Inc. <br />3.1 Project Fees <br />We recommend establishing a budget of $47,575.00 for the services described above. We propose to <br />perform the Assessment and Design Review Phase services for the lump sum of $19,900.00 and to <br />perform the Construction Administration Phase services on a time and expense basis. <br />The Construction Administration Phase service Costs should be considered estimated allowances and <br />can be considered "not -to -exceed" costs for this project without prior approval. Deviations from the <br />assumed quantities and timeframes detailed in this proposal are not included and will be considered <br />as an addition to our proposed scope of service. Costs for additional services will be calculated using <br />the enclosed schedule of fees for additional services. <br />Project Fee <br />Qty <br />Rate <br />Unit <br />Cost <br />Assessment and Design Review <br />Phase <br />Document Review <br />1 <br />$2,000.00 <br />lump sum <br />$2,000.00 <br />Visual Building Enclosure <br />1 <br />$6,200.00 <br />lump sum <br />$6,200.00 <br />Assessment <br />Assessment Report <br />1 <br />$3,600.00 <br />lump sum <br />$3,600.00 <br />Building Enclosure Design <br />1 <br />$6,700.00 <br />lump sum <br />$6,700.00 <br />Review <br />Collaboration Meetings <br />2 <br />$700.00 <br />lump sum <br />$1,400.00 <br />Activity Total <br />$19,900.00 <br />Construction Administration Phase <br />General Enclosure 45 $295.00 per hour $13,275.00 <br />Consulting <br />Quality Assurance 6 $2,400.00 per day $14,400.00 <br />Observation <br />Activity Total $27,675.00 <br />Grand Total $47,575.00 <br />Should conditions or observations indicate that additional work is necessary or warranted, we would <br />notify you of the additional costs before modifying or expanding the extent of our scope of <br />services. Before modifying or expanding the scope, you would be informed of our intentions for your <br />review and authorization. The following schedule of fees will be utilized for additional services upon <br />request. <br />April 22, 2025 <br />Page 4 <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.