Laserfiche WebLink
ECS Pacific, Inc. <br />3.1 Project Fees <br />We recommend establishing a budget of $47,575.00 for the services described above. We propose to <br />perform the Assessment and Design Review Phase services for the lump sum of $19,900.00 and to <br />perform the Construction Administration Phase services on a time and expense basis. <br />The Construction Administration Phase service Costs should be considered estimated allowances and <br />can be considered "not -to -exceed" costs for this project without prior approval. Deviations from the <br />assumed quantities and timeframes detailed in this proposal are not included and will be considered <br />as an addition to our proposed scope of service. Costs for additional services will be calculated using <br />the enclosed schedule of fees for additional services. <br />Project Fee <br />Qty <br />Rate <br />Unit <br />Cost <br />Assessment and Design Review <br />Phase <br />Document Review <br />1 <br />$2,000.00 <br />lump sum <br />$2,000.00 <br />Visual Building Enclosure <br />1 <br />$6,200.00 <br />lump sum <br />$6,200.00 <br />Assessment <br />Assessment Report <br />1 <br />$3,600.00 <br />lump sum <br />$3,600.00 <br />Building Enclosure Design <br />1 <br />$6,700.00 <br />lump sum <br />$6,700.00 <br />Review <br />Collaboration Meetings <br />2 <br />$700.00 <br />lump sum <br />$1,400.00 <br />Activity Total <br />$19,900.00 <br />Construction Administration Phase <br />General Enclosure 45 $295.00 per hour $13,275.00 <br />Consulting <br />Quality Assurance 6 $2,400.00 per day $14,400.00 <br />Observation <br />Activity Total $27,675.00 <br />Grand Total $47,575.00 <br />Should conditions or observations indicate that additional work is necessary or warranted, we would <br />notify you of the additional costs before modifying or expanding the extent of our scope of <br />services. Before modifying or expanding the scope, you would be informed of our intentions for your <br />review and authorization. The following schedule of fees will be utilized for additional services upon <br />request. <br />April 22, 2025 <br />Page 4 <br />C <br />