Laserfiche WebLink
CITY OF SANTA ANA <br />13 <br />each city’s IT staff to establish such connection in conformance to each agency’s IT policies. If needed, <br />the consultant may elect to furnish and install a communications server at TMC/central office to <br />facilitate communications between its TSP cloud application platform and the traffic signal controllers. <br />Subtask 5.5: System Configuration and Deployment <br />The consultant shall set up and configure the TSP system including entering all system and configuration <br />parameters. This includes integrating the 19 signalized intersections and one bus route under this project <br />into the TSP cloud application platform. <br />The consultant shall configure initial settings such as conditional parameter and other operating <br />parameters. Values for conditional parameters shall be approved by City of Santa Ana. The consultant <br />shall develop TSP signal timing parameters for each intersection traffic signal controller. These include <br />controller parameters for defining the transit phase, values for early green and green extension, <br />maximum priority call time, minimum time between consecutive priority requests, etc. The TSP signal <br />timing parameters will be submitted to City for their review and approval. Upon approval, the consultant <br />shall coordinate with City to implement the approved timing parameters into each controller. <br />The consultant will also be responsible for any timing modifications necessary for the operation of the <br />TSP. Timing modifications shall include, but is not limited to basic timing, coordination timing, and transit <br />parameters available in the City’s system. Close coordination with City staff will be necessary to ensure <br />modifications are made per City standards and preference. <br />Subtask 5.6: Pilot Deployment Testing <br />The consultat shall activate and deploy the TSP system at two intersections initially to assess issues <br />related to latency, communications with buses or CAD/AVL, etc. Consultant shall submit test results for <br />every test completed as included in the approved pilot test plan. The consultant shall note any exceptions <br />to a test such as test conditions, corrective actions, or re-testing. The pilot deployment testing phase is <br />not complete until the test report is approved by City of Santa Ana. <br />Subtask 5.7: Full System Configuration and Deployment <br />Following acceptance of Pilot Deployment Testing, the consultant shall then activate and deploy the TSP <br />system at all intersections for field operation and fine-tune all system settings, configuration parameters, <br />and controller timing parameters to satisfy the system requirements. <br />Transit Signal Priority Implementation Technical Memorandum: The consultant shall prepare a <br />memorandum detailing the TSP solution, including the logic for implementing the recommended solution <br />and timing and how it can be scaled to other corridors and citywide. The memorandum shall also include <br />any challenges regarding the procurement, configuration, and implementation that can be addressed for <br />future implementations. The consultant shall share the draft of this memorandum with all stakeholders to <br />provide their input for additional consideration outside of the prototype area. <br />Task 5 – Deliverables (One hard copy and an electronic version of each): <br />-Implementation Plan Memorandum <br />-Pilot TSP Deployment <br />-Full System Deployment <br />-Summary of System Configurations