Laserfiche WebLink
CITY OF SANTA ANA <br /> <br /> <br />14 <br /> <br /> <br />VI. Task 6: Project Evaluation and Assessment <br /> <br />Subtask 6.1: Technology Evaluation and Assessment <br />This sub-task will continue to monitor, evaluate, assess, and modify the solutions to ensure it meets the <br />expectations and proof of technology of the project. <br /> <br />Proof of Technology: Immediately following the implementation of the project solutions and for a minimum <br />period of three (3) months, the consultant shall evaluate and assess the solutions based on the metrics <br />identified in Sub-Task 2.2. During this period, the consultant shall make the necessary adjustments to <br />equipment configuration, timing, and technology based on field visits, agency comments, and the system <br />reporting. <br /> <br />Technology Evaluation and Assessment Technical Memorandum: The consultant shall prepare a <br />memorandum summarizing the proof of technology evaluation and assessment completed as part of this <br />sub-task. This memorandum shall include the consultant’s recommendation for fine tuning the system, <br />including any infrastructure improvements to achieve the performance desired by each stakeholder in <br />their jurisdiction. <br /> <br />Subtask 6.2: Performance Measure Comparison <br />Concurrently with and following Sub-Task 6.1, the consultant shall collect the same performance metrics <br />determined in Sub-Task 2.2. City of Santa Ana reserves the right to validate the performance data’s <br />accuracy. Should City determine that the data is not meeting the minimum requirements for data <br />accuracy, City will require the consultant to determine how long and how much of the data is inaccurate <br />and provide a written plan of how the consultant plans to remedy the data inaccuracy. <br />The consultant shall prepare a Performance Measure Comparison Memorandum to summarize all <br />qualitative and quantitative improvements identified. <br /> <br />Task 6 – Deliverables (One hard copy and an electronic version of each): <br />- Technology Evaluation and Assessment Technical Memorandum <br />- Performance Measure Comparison Memorandum <br /> <br />VII. Attachments <br /> <br />A. Attachment A – Santa Ana Cooperative Transit Study <br /> <br /> <br /> <br /> <br /> <br /> <br />