My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Agreement for Median and Right Landscape and Maintenance
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/03/2025
>
Item 16 - Agreement for Median and Right Landscape and Maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 5:04:57 PM
Creation date
5/28/2025 4:14:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
16
Date
6/3/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aCITY OF SANTA ANA <br />cellular phone for each crew, to perform the required data entry in the field. <br />i. The Contractor will be solely responsible for maintaining the device in <br />working order to complete the required data entry for the City. <br />e. The Contractor will be required to obtain a cellular internet data plan cost using one <br />of the following carriers: <br />i. AT&T wireless, <br />ii. Verizon, <br />iii. T-Mobile or <br />iv. Sprint <br />2 Maintenance Function Checklist and Reports <br />a. Daily Attendance Sign in Sheet: Provided by the Contractor on a daily basis by <br />7:30 am, including the signatures of each laborer and crew assignment, date, <br />and hours to be worked. <br />i. Contractor shall update the hours worked if any laborer leaves early. <br />b. Daily Work Report: Prepared by Contractor on a daily basis and specifies the <br />work performed; date performed; and labor, materials and supplies used, and <br />amount of trash and debris collected (measurement method to be agreed <br />upon). <br />c. Weekly Report <br />i. Due: Monday of every week <br />ii. Contents: Ensure that the report contains all the required and approved <br />content, which may include, but not limited to: <br />1. Description of work completed <br />2. Description of the actual inspection, observation, repair and/or <br />maintenance of landscaping, signage, lighting, streetscape, and <br />graffiti <br />d. Report Guidelines: <br />i. Submit records in the time required, in the method required, and on the <br />forms required. <br />ii. Include any pertinent information or backup documentation with your <br />reports. <br />iii. Monthly payment will not be made until reports are received by City. <br />e. Documentation <br />i. Digital Photo Sampler Report <br />1. Take a series of before -and -after photos of items, areas, or <br />incidents that Contractor responds to as specified by City. <br />2. Maintain these photos electronically and make them available for <br />inspection by City at any time. <br />3. Identify photos by location, description, etc. before or after, date <br />and time of photo taken. <br />3. Meetings <br />a. General Guidelines <br />30 <br />MEDIAN AND RIGHT OF WAY LANDSCAPING MAINTENANCE — RFP #25-058 <br />
The URL can be used to link to this page
Your browser does not support the video tag.