Laserfiche WebLink
PROJECT TITLE: <br />Civic Center Rehab: Minter to <br />Santiago <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />\ <br />\ ,.., \ \ <br />.,,. <br />\ \ <br />,: <br />,.,. ,.,, <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Replacement of existing asphalt roundabout intersection pavement <br />with Portland cement concrete pavement and AC pavement <br />rehabilitation along Civic Center Drive between Minter Street and Santiago Street. <br />PROJECT COSTS FY 25/26 FY 26/27 <br />Engineering 742,000 <br />TOTAL 742,000 <br />SOURCE OF FUNDS FY 25/26 FY 26/27 <br />GENERAL FUND <br />RMRASB1 742,000 <br />TOTAL 742,000 <br />FY 27/28 <br />FY 27/28 <br />DIVISION: CONTACT: <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating due to the weather, age, and heavy usage. Some of the adjacent curbs, gutters, driveway approaches, curb ramps, and sidewalks are also in various states of disrepair and require replacement. <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />GIP Engineering Marc Canta, Senior Civil Engineer <br />DATE: <br />17-Apr-2025 <br />4 <br />EXHIBIT 2