My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - for Fiscal Year 2025-26 Senate Bill 1 Local Steets and Roads Fudning Program
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
06/03/2025
>
Item 21 - for Fiscal Year 2025-26 Senate Bill 1 Local Steets and Roads Fudning Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2025 4:55:46 PM
Creation date
5/28/2025 4:51:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
6/3/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Civic Center Rehab: Minter to <br />Santiago <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />\ <br />\ ,.., \ \ <br />.,,. <br />\ \ <br />,: <br />,.,. ,.,, <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Replacement of existing asphalt roundabout intersection pavement <br />with Portland cement concrete pavement and AC pavement <br />rehabilitation along Civic Center Drive between Minter Street and Santiago Street. <br />PROJECT COSTS FY 25/26 FY 26/27 <br />Engineering 742,000 <br />TOTAL 742,000 <br />SOURCE OF FUNDS FY 25/26 FY 26/27 <br />GENERAL FUND <br />RMRASB1 742,000 <br />TOTAL 742,000 <br />FY 27/28 <br />FY 27/28 <br />DIVISION: CONTACT: <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating due to the weather, age, and heavy usage. Some of the adjacent curbs, gutters, driveway approaches, curb ramps, and sidewalks are also in various states of disrepair and require replacement. <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />GIP Engineering Marc Canta, Senior Civil Engineer <br />DATE: <br />17-Apr-2025 <br />4 <br />EXHIBIT 2
The URL can be used to link to this page
Your browser does not support the video tag.