Laserfiche WebLink
PROJECT TITLE: <br />Dyer Rd Rehab: Main to Grand <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />-� <br />LOCATION MAP � ,_,. --.... , _...J .... � --·- <br />, __ <br />i ' ,_, !,-,� ! <br />,_, <br />,� --l .... ,,. -· <br />·--, __ ·-· --!11 /4 <br />_ <br />!l i ! <br />'l <br />[I,_� ... ;�' l <br />[Colo ...... ,.. <br />I <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps along Dyer Road between Main Street and Grand Avenue. <br />PROJECT COSTS FY 25/26 FY 26/27 <br />Construction <br />Engineering 595,100 <br />TOTAL 595,100 <br />SOURCE OF FUNDS FY 25/26 FY 26/27 <br />RMRASB1 595,100 <br />TOTAL 595,100 <br />FY 27/28 <br />FY 27/28 <br />DIVISION: CONTACT: <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has been <br />developed to prioritize and recommend the most cost-effective roadway repairs, and maximize the return from available funding for street pavement. This segment of Dyer Road pavement rehabilitation is identified as a high priority in the PMP. <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />GIP Engineering Gilbert Castillo, Senior Engineer <br />DATE: <br />17-Apr-2025 <br />5 <br />EXHIBIT 2