My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 - HSGPROJQTRLYRPT PDF
Clerk
>
Agenda Packets / Staff Reports
>
Housing Authority (1999 - Present)
>
2010
>
02/01/2010
>
03 - HSGPROJQTRLYRPT PDF
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 3:30:33 PM
Creation date
7/30/2010 10:44:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
03
Date
2/1/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> t <br /> Quarterly Report for Housing <br /> Division Prajects and Activities <br /> February 1, 2 ~ 1.0 <br /> Page 5 <br /> ~n addition, the Agency selected Nape Builders, Division of Taller San <br /> base, as develaper far two ing~.e-~an~ily homey on a site identified ~ <br /> X42 E, Central Avenue, 'This site wi11 afford Hope training in the <br /> construction of single-family dwellings and ait ~.n their mission of <br /> praviding high quality cantruotion jobs for local Santa Ana ~eident <br /> who are graduates of `faller San dose. <br /> The Agency' action included authority for the Agency Executive Director <br /> to begin negotlat~.ons with each of the Developers to determine the terms <br /> and conditions of a DDA. <br /> Station Dit~`~.et <br /> Community outreach efforts for the Station District, 94-acre area <br /> anchored by the Santa Ana Regional Transportation Center{ have yielded a <br /> tremendous amount of input and ideas for addressing community needs and <br /> enhancing the area. Five co~nun~.ty forums and many smaller meetings were <br /> held to peek input on the planning and development of the numerous <br /> <br /> parcels the Agency~City have acquired along the Santa Ana Boulevard <br /> cox~ridar, a well ~ the larger Station District area. Th~.s corridor is <br /> a key connection from the I-5 freeway into the Do~antown and gill also <br /> serve as a major transportation link far the planned Co Local Fired <br /> Guideway System, <br /> s <br /> The developer teal, Related~~riffin, is nor conducting deign and <br /> fealbll~ty tud~.e on the Agency parcels based on the input received. <br /> The strategy far the larger district area will be developed concurrently; <br /> however, gi~ren that it covers ~ more extensive area and to enure <br /> coordination with the planned transit projects, the time f rave for the <br /> end product gill follow the planning effort for the Agency-~a~rned pareeis . <br /> e expect that a concept p~.an far the Agency parcels gill be ready for <br /> community input in January. The City planning and entitlement process <br /> <br /> will fallow. Planning approvals are needed ~.n time far the de~relaper to <br /> submit an application for affardab~.e housing tax credits in duly OiO, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.