Laserfiche WebLink
DBA No. 2025-03 — Olive Crest (2130 East Fourth Street) <br />June 23, 2025 <br />Page 7 <br />on the first floor and 14,907 square feet on the second floor. Pursuant to the City's off-street <br />parking requirements, the office building requires a total of 94 parking stalls. Moreover, the <br />required residential parking pursuant to the State Density Bonus requirements would be 23 <br />spaces. Therefore, the total required parking for the Project would be 117 parking spaces. <br />The Applicant is proposing a total of 136 surface parking stalls, which would be a surplus of <br />19 parking stalls. <br />Given the above parking analysis, the Project is not anticipated to have any parking impacts. <br />However, to proactively address any neighborhood parking impacts that could result from <br />the Project, the conditions of approval and terms of the DBA include provisions requiring the <br />following parking management practices, to be incorporated into the Project and which shall <br />apply throughout the life of the Project: <br />Requiring onsite parking permits (such as stickers or hang -tags) for any parking <br />dedicated to the residential units, inclusive of guest parking spaces; <br />Policies for maximum time vehicles may be parked in the surface guest spaces; and <br />Policies for towing unauthorized vehicles; vehicles parked in unauthorized locations, <br />such as fire lanes; vehicles parking in surface guest parking without a sticker, hang - <br />tag, or other identifiers; and vehicles parked longer than any maximum guest parking <br />timeframes allowed. <br />Protect Analysis <br />Pursuant to SAMC Section 41-1607, the Planning Commission must review and approve <br />deviations based on specified findings. The Planning Commission's approval of the <br />deviations is based on the following: <br />The proposed development will materially assist in accomplishing the goal of <br />providing affordable housing opportunities in economically balanced communities <br />throughout the city. <br />2. The development will not be inconsistent with the purpose of the underlying zone <br />or applicable designation in the general plan land use element. <br />3. The deviation is necessary to make it economically feasible for the applicant to <br />utilize a density bonus authorized for the development pursuant to section 41- <br />1603. <br />