Laserfiche WebLink
EXHIBITA <br /> walawdl. SimplyFuel Solutions <br /> ELEVATE YOUR PROCESS <br /> ail F-L Ward,Inc company <br /> City of Santa Ana•Sao swlth Fuel Hardware&Labor (mwwvl 6)•5-19-202S <br /> Sourcewell#081524-EJW <br /> Tu�M-Ke�Fuel Marlagerneht System.Hosted by SlonplyFuel Solutions I.I.C. <br /> Includes-Tank Level Monitoring and Compliance Reporting Module <br /> Tank Level Monitoring and Compliance Reporting Module-(Requires connection to an existing compatible TLS) <br /> Part# Description-Cloud Hosted Fuel View IOT Software Application City Price Month Extended <br /> LOT-5aa5 Hooting Fuel View IOT-Includes Cellular Communication-24x7x365 Call Center Support.24 Itonths Live Data Year 1 785.00 $9,420.00 <br /> Included:(3)FCT4GT&(2)n s Cell Modem-Kieypad Entry,FOB,CANcelver and VG use enabled <br /> Software User and Administrator Training•Online(2hr Session) <br /> Part# Model/Description City Price Extended <br /> FC,tOT•SH 5-hose Cellular IOT Terminal-Keypad Entry,FOR,CANceiver and TAG use enabled 1 $7,462.68 $1,462,69 <br /> EXCLUDED:Any con standard cellular antenna configuration caused IV a local environmental condition outside <br /> El.Wilyd control. <br /> FCT-IOT•101 10,hose Cellular IOT Terminal-Keypad Entry,FOB,CANcetver and TAG use enabled 1 $7,960.19 $7,960.19 <br /> EXCLUDEDI Any not standard cellular antenna configuration caused by a Loral environmental condition outside <br /> El.Llhrd control. <br /> C45MART•DBOX Sman D3OX vdth Firmware License 2 $2,781.93 - $5,563,56 <br /> TLS-GC-IOT Serial t Ether Intelligent Ada;w Pwfspiy 2 $80.a <br /> KIT-HOTSPOT Cellular Hotspet Kit*TLS or Other 2 $1,991.96 $3,983.91 <br /> KEY-ENCODE-5321 Encoder Key rob Mifam 2434 1 $684.02 W Charge <br /> KEY400-1434 Key Fab Mifare Unprogrammed 1434 b 11.98 No Charge <br /> Shipping and Handling 1 $1,250.DD $1,250,00 <br /> Subtotal 27,088-46 <br /> Part# Model/Description Oty Price Extended <br /> LABOR FV Software Implementation/Account Activation-24 Months Live Data Included 1 $1,999.20 Ab Charge <br /> MISC API Pr Flat File Exportto RTA 1 1,999.20 No Charge <br /> WBORPM Project Management(per hour) 40 $16o.ou $6,400A0 <br /> Part# Corporate Yard,215 S Center St.Santa Ana CA•Model Description City Pr ce Extended <br /> LABOR and SCOPE:Generate CAD drawings and submit for permits with Orange County environmental health.Remove 1 $201,317.65" $201,317.65 <br /> HARDWARE existing system and Install(1)IOT unit on outside Island.Damo existing emt conduit from Inside island bo <br /> Quote 25.00SSs breaker panel and m Install rigid explosion proof conduit from breaker panel to 10T.Remove(9)dispenser and <br /> Prevailing Wage Is Install only(6)new dispensers(4-dual product dual hose unleaded&2-single product single hose diesel). <br /> Included. Existing ground mounted diesel filters will Le removed as new diesel dispenser comes with Internal filter.Old <br /> dispensers removed Rom bland will he drained and left on site for customer to dispose of.The 2 existing Unleaded <br /> and I existing diesel dispensers not being replaced will be removed from the fuel Island,pipe risers will In <br /> capped and UDC openings will be covered.New comm/control wiring will he pulled from each new dispenser <br /> to the IOTs..(1)Wand cellular wireless network unit will be Installed to connect Veeder Root to IOT.NOTE: <br /> Ward b provide cellular wireless tank monitor connection.Bind netting in place will be moved and secured <br /> during work and put back In place after work Is completed.Customenav the preporedto be withoutfuelforat <br /> feast 5-7 days during this mull week project IOTs WILL MUSr COME WITH CURRENT LOOP COMMUNICATION <br /> FOR CONTROLLING WAYNE SELECT DIGITAL DFSPEN5ER5 DIRECT WITH D-BOX. <br /> EXCLUSIONS:-if unforeseen conditions are encountered once Installation begins B Wad will notify the City <br /> and ask for clarification on how to proceed and will advise of any additional cost <br /> Part# Santa Ana PO.50 Civic Center Plaza,Santa Ana CA-Model/pescription Oty Prim Extended <br /> LABOR and SCOPE:Remove existing system and install(1)LOTnd a nodule,existing conduit and dispenser to IOT as needed 114,256.25 14,256.2Remove <br /> HARDWARE and install(1)nevv conduit from dispenser I/2 to IOT surface maunted to the fuel Island.Existing power <br /> Quote 24-0199sit 1 and wire will be reused.New control and pulsar wiring will be pulled from each dispenser to the IOT(2) <br /> Prevailing Wage Is Gas boy pulse outputboards will be supplied and Installed as needed.(1)Ward cellular wireless network unit <br /> Included. will k installed to lnnect the EVOS50. <br /> EXCLUSIONS:-If unforeseen conditions are encountered once Installation begins B Ward will notify the City <br /> and ask for clarification on how to proceed and will advise of any additional cost <br /> 12621 Silicon Drive, Suite 113, San Antonio, TX 78249 <br /> Tel: 210- 824-7383 <br /> www.eiward.com <br />