Laserfiche WebLink
EXHIUITA <br />twarty- <br />ELEVATE YOUR PROCE <br />' SimplyFuel Solutions <br />s en EEj Ward, Inc. company <br />Part& <br />TL5 Replacement- ModeVDescription <br />Qty <br />price <br />Extended <br />LABOR and <br />1 <br />$297,128.75 <br />$297,11.12,7S <br />HARDWARE <br />Prevailing Wage Is <br />Overview of the Project Scope: <br />included, <br />Remove existing TLS <br />Replace it with a VR 45O <br />Includes Removal, Install, Permitting_. Enclosure Cabinet <br />Includes Sensor Cable Replacement Includes Relocating to Car Wash Building <br />COMPLETE PROJECT SCOPE FOR TL5 PROJECT 19 N NOTES SECTION <br />Parts! <br />FutuFe CNG fuel control terminal - Modell Description <br />Qty <br />Price <br />Extended <br />FCT-IOT--SH <br />5-hose Cellular TOT Terminal -Keypad Entry, FOB, CANcalver and TAG use enabled <br />1 <br />$7,462,68 <br />$7,462.69 <br />EXCLUDED: Any non standard cellular antenna Configuration caused by a local environmental condition outside <br />EJ, Ward control, <br />CL-SMART-DBOX <br />Smart D-BOX with Firmware License <br />1 <br />$2,781.93 <br />$2,781,93 <br />LABORPM <br />Project Management (per hour) <br />8 <br />$160,00 <br />$1,280.00 <br />Shipping and Handling <br />1 <br />$525.00 <br />$525,Oo <br />Subtatol <br />$531,142.25 <br />Hardware, One (tl year Warranty <br />I Year 1 <br />Subtotal <br />$567,O5D.72 <br />Project Contingency <br />10% <br />$56,765.D7 <br />Total <br />$624,413.79 <br />Notes; 1, QuatevaliduntilH-19-2025 <br />2. Annual agreement required on all Saas Implementations, longer fixed fee terms available upon request. <br />3. Includes Lifetime Software Version Updates while on a Saas Agreement <br />4, Includes 24006$ Cali Center Support and lifetime IOT FCT parts replacement while an the Seas platform (service labor at annual quoted <br />rates) <br />S A Maximum of 24 Falling months of live data will be available. at additional cast longer archive periods am available for all SaaS customers. <br />fv Warranty DOES NOT indude Hardware or Software that is dedared "END OF LIEF' or previously declared unsupportable <br />7, Software use governed by the End User License Agreement (ELLA) <br />CONTRACTOR SCOPE OF WORK: FOR WEEDER ROOT pROJECT) <br />Generate drawings and submit for permits with Orange County environmental health, Remove Veeder Root console system and Install 0 )new <br />Weeder Root TLS•450PIus with ethernet and RS-232 Port. All existing Probes, sensorsr overfill valve, line teak detectors, cabling and wire will <br />be reused. (5) New DPLLD line leak detectors will need to be supplied and replaced as existing are not compatible, (1) New Overfill Alarm and <br />Acknowledgment Switch will be supplied to replace existing unit. Overfill Alarm will be relocated to above red door R is currently mounted <br />next to. New Console will be installed in the same place existing unit it located. Relocate Weeder Root Console to Room at Fuel Island. New <br />power and control wire conduits will be ran from breaker and junction boxes at Fuel Area IN EMT. Existing sensors will be intercepted at an <br />existing inground transltionr from which approximately 300' trench will be ran to the fuel Island hullding. Fuel Sere will Sawcut and dome <br />approx. 300' lineal feet of concrete, excavate 18" deep, Install Y' pvc, dispose of debris, drill and set dowels In remaining slab 24" on center, <br />Rackflll and pour and finish concrete, PVC will be ttansitioned to steel prior to rising out of trench with a seal offand extend be Weeder root as <br />needed in EMT. Supply and pull new 2-wire shielded with drain cable from existing Inground transition to the new Weeder Root location. <br />Trench will be coned and caution taped offto block traffic, Covering trench N not included, wood or steel plates to span trench for traffic Is <br />not Included, customer Is welcome to supply and set steel plates in small area for traffic passage during work. Supply and pull new 2wdre <br />shielded with drain cable from existing Veeder Root to (36) Weeder Root Sensors, Probes, PLLDs, etc Fuel Sam will terminate and land wire In <br />existing Vander Root and Splice wire at oath sensor/probes existing junction box. Total cable amount not to exceed 13,090 feet. Alan R b <br />assumed all existing conduit bath above and below ground is in good condition and will allow old cable removal and new cable Installation. I: <br />Is also assumed all conduit and junctions meet the requirement for dedication to sensor and probe cables only, If any other cabling or wiring is <br />found to he co -mingling it will have to he removed and rerouted at an additional cast. This Includes low voltage or communication cable/wire. <br />This work Is limited to the (5) tanks (3-unl JAM 1-wa) and 9-fuel dispensers. Replacement ofjunctlon boxes due to frozen/missing/broken <br />lids up to (1(l) units are included In this quote along with (90) seal offs. upon completion perform function test of all sensors, positive <br />shutdown and overfill alarm. Schedule and perform ill final inspection/ monitor cart with Orange County Environmental Health. NOTE; <br />Prevailing Wage it Included. I is assumed all existing sensors and probes are Weeder Root MFG and air cabling for sensors and probes are <br />Belden 2-wire with shield and drain, if not Replacement Sedsars and Probes and Cabling are not included In this quote, TRENCH WILL CROSS <br />THE YARD AND CREATE HINDRANCE ON YARD TRAFAC, Contractor will work Monday thru Friday lam to 4pm and will not be restricted in <br />access unless a city recognized holiday Is encountered during project. <br />EXCLUSIONS: If unforeseen conditions are encountered once Installation begins FJ Ward will notify the Cityand ask for Clarification an how to <br />proceed and will advise ofany additional cast. Any requests by the city not specifically mentioned in the above scope ofwork will be an <br />additional cost. Bonding ofany kind. <br />12621 Silicon Drive, Suite 113, San Antonio, TX 78249 <br />TO 210- 824-7383 <br />www.emward.com <br />