Laserfiche WebLink
EXHIUCIA <br /> SimplyFuel Solutions <br /> ELEVATE YOUR PROCESS <br /> s en EEj Ward,Inc.company <br /> Part& TL5 Replacement-ModeVDescription Qty price Extended <br /> LABOR and 1 $297,128.75 $297,11.12,7S <br /> HARDWARE <br /> Prevailing Wag.k Overview of the Project Scope: <br /> included, Remove existing TLS <br /> Replace it with a VR 45O <br /> Includes Removal,Install,Permittl0g,.,,Includes Enclosure Cabinet <br /> Includes Sensor Cable Replacement Includes Relocating to Car Wash Building <br /> COMPLETE PROJECT SCOPE FOR TL5 PROJECT 19 N NOTES SECTION <br /> Parts! Future CNG fuel control terminal-Modell Description Qty Price Extended <br /> FCT-IOT-SH 5-hose Cellular IOT Terminal-Keypad Entry,FOB,CANcelver and TAG use enabled 1 $7,462,68 $7,462.69 <br /> EXCLUDED:Any non standard cellular antenna configuratlan caused by a local environmental Condition outside <br /> EJ,Ward control, <br /> CL-SMART-DBOX Smart D-BOX with Firmware License 1 $2,781.93 $2,781,93 <br /> LABORPM Project Management(per hour) 8 $16D,DD �$$!93�1,142.25 <br /> 80.00 <br /> Shipping and Handling 1 $525,00 5,00 <br /> Subtotal <br /> Hardware, One it)year Warranty Year 1 Subtotal $567,OSD.72 <br /> Project Contingency )O% $56,765.07 <br /> I! Total $624,413.79 <br /> i <br /> Notes;1,Quatava11du at11H-19-24)25 <br /> 2.Annual agreement required on all Saas Implementations,longer fixed fee terms available upon request. <br /> 3.Includes Lifetime Software Version Updates while on a Saas Agreement <br /> 4,Includes 24006$Cali Center Support and lifetime IOT FCT parts replacement while an the Seas platform(service labor at annual quoted <br /> rates) <br /> 5 A Maximum of 24 Falling months of live data will be available.at additional cast longer archive periods are available for all SaaS customers. <br /> di. Warranty DOSS NOT indude Hardware or Software that IS dedored"END OF LIFF'or previously declared unsupportable <br /> 7, Software use governed by the End User License Agreement(ELLA) <br /> CONTRACTOR SCOPE OF WORK:FOR WEEDER ROOT pROJECT: <br /> Generate drawings and submit for permits with Orange County environmental health,Remove Veeder Root Console system and Install G)new <br /> Weeder Root TLS•450PIus with ethernet and RS-232 Port.All existing Probes,sensorsr overfill valve,line beak detectors,cabling and wire will <br /> be reused.{5)New DPLLD line leak detectors will need to be supplied and replaced as existing are not compatible,(1)New Overfill Alarm and <br /> Acknowledgmen it Switch will be supplied to replace existing unit.Overfill Alarm will be relocated to above red door is currently mounted <br /> next to. New Console will be installed in the same place existing unit it located. Relocate Weeder Root Console to Room at Fuel Island.New <br /> power and control wire conduits will be ran from breaker and junction boxes at Fuel Area in EMT.Existing sensors will be intercepted at an <br /> existing inground transltionr from which approximately 3DD'trench will be ran to the fuel Island hullding.Fuel Sere will Sawcut and dome <br /> apprOx.300'lineal feet of concrete,excavate 18"deep,Install Y'pvc,dispose of debris,drill and set dowels In remaining slab 24"on center, <br /> Rackflll and pour and finish concrete,PVC will be ttan*10110d to steel prior to rising out of trench with a seal offand extend be Weeder root as <br /> needed in EMT.Supply and pull new 2-wire shielded with drain cable from existing Inground transition to the new Weeder Root location. <br /> Trench will be coned and caution taped offto block traffic,Covering trench IS not included,wood or steel plates to span trench for traffic Is <br /> not Included,customer Is welcome to supply and set steel plates in small area for traffic passage during work.Supply and pull new 2wdre <br /> shielded with drain cable from existing Veeder Root to(36)Weeder Root Sensors,Probes,PLLDs,etc Fuel Sam Will terminate and land wire In <br /> existing Veeder Root and Splice wire at oath sensor/probes existing junction box.Total cable amount not to exceed 13,090 feet.Also R b <br /> assumed all existing conduit both above and below ground is in good condition and will allow old cable removal and new cable Installation.I: <br /> Is also assumed all conduit and junctions meet the requirement for dedication to sensor and probe cables only,If any other Cabling or wiring is <br /> found to he co-mingling it will have to be removed and rerouted at an additional Cast.This Includes low voltage or communication cable/wire. <br /> This work Is limited to the(5)tanks(3-unl IASI 1-wa)and 9-fuel dispensers.Replacement afjunctloq boxes due to frozen/missing/broken <br /> lids up to(10)units are included In this quote along with(90)seal offs. Upon completion perform function test of all sensors,positive <br /> shutdown and overfill alarm.Schedule and perform ill final inspection/monitor cart with Orange County Environmental Health.NOTE; <br /> Prevailing Wage it Included.I is assumed all existing sensors and probes are Weeder Root MFG and air cabling for sensors and probes are <br /> Belden 2-wire with shield and drain,if not Replacement Sensors and Probes and Cabling are not included In this quote,TRENCH WILL CROSS <br /> THE YARD AND CREATE HINDRANCE ON YARD TRAFAC,Contractor will work Monday thru Friday lam to 4pm and will not be restricted in <br /> access unless a city recognized holiday Is encountered during project. <br /> EXCLUSIONS;If unforeseen conditions are encountered once Installation begins FJ Ward will notify the Cityand ask for Clarification an how to <br /> proceed and will advise ofany additional Cast,Any requests by the city not specifically mentioned in the above scope ofwork will be an <br /> additional cost.Bonding ofany kind. <br /> 12621 Silicon Drive, Suite 113, San Antonio, TX 78249 <br /> TO 210- 824-7383 <br /> www.e'ward.com <br /> i <br />