<br />TL5 Replacement- ModeVDescription
<br />Qty
<br />price
<br />Extended
<br />LABOR and
<br />1
<br />$297,128.75
<br />$297,11.12,7S
<br />HARDWARE
<br />Prevailing Wage Is
<br />Overview of the Project Scope:
<br />included,
<br />Remove existing TLS
<br />Replace it with a VR 45O
<br />Includes Removal, Install, Permitting_. Enclosure Cabinet
<br />Includes Sensor Cable Replacement Includes Relocating to Car Wash Building
<br />COMPLETE PROJECT SCOPE FOR TL5 PROJECT 19 N NOTES SECTION
<br />Parts!
<br />FutuFe CNG fuel control terminal - Modell Description
<br />Qty
<br />Price
<br />Extended
<br />FCT-IOT--SH
<br />5-hose Cellular TOT Terminal -Keypad Entry, FOB, CANcalver and TAG use enabled
<br />1
<br />$7,462,68
<br />$7,462.69
<br />EXCLUDED: Any non standard cellular antenna Configuration caused by a local environmental condition outside
<br />EJ, Ward control,
<br />CL-SMART-DBOX
<br />Smart D-BOX with Firmware License
<br />1
<br />$2,781.93
<br />$2,781,93
<br />LABORPM
<br />Project Management (per hour)
<br />8
<br />$160,00
<br />$1,280.00
<br />Shipping and Handling
<br />1
<br />$525.00
<br />$525,Oo
<br />Subtatol
<br />$531,142.25
<br />Hardware, One (tl year Warranty
<br />I Year 1
<br />Subtotal
<br />$567,O5D.72
<br />Project Contingency
<br />10%
<br />$56,765.D7
<br />Total
<br />$624,413.79
<br />Notes; 1, QuatevaliduntilH-19-2025
<br />2. Annual agreement required on all Saas Implementations, longer fixed fee terms available upon request.
<br />3. Includes Lifetime Software Version Updates while on a Saas Agreement
<br />4, Includes 24006$ Cali Center Support and lifetime IOT FCT parts replacement while an the Seas platform (service labor at annual quoted
<br />rates)
<br />S A Maximum of 24 Falling months of live data will be available. at additional cast longer archive periods am available for all SaaS customers.
<br />fv Warranty DOES NOT indude Hardware or Software that is dedared "END OF LIEF' or previously declared unsupportable
<br />7, Software use governed by the End User License Agreement (ELLA)
<br />CONTRACTOR SCOPE OF WORK: FOR WEEDER ROOT pROJECT)
<br />Generate drawings and submit for permits with Orange County environmental health, Remove Veeder Root console system and Install 0 )new
<br />Weeder Root TLS•450PIus with ethernet and RS-232 Port. All existing Probes, sensorsr overfill valve, line teak detectors, cabling and wire will
<br />be reused. (5) New DPLLD line leak detectors will need to be supplied and replaced as existing are not compatible, (1) New Overfill Alarm and
<br />Acknowledgment Switch will be supplied to replace existing unit. Overfill Alarm will be relocated to above red door R is currently mounted
<br />next to. New Console will be installed in the same place existing unit it located. Relocate Weeder Root Console to Room at Fuel Island. New
<br />power and control wire conduits will be ran from breaker and junction boxes at Fuel Area IN EMT. Existing sensors will be intercepted at an
<br />existing inground transltionr from which approximately 300' trench will be ran to the fuel Island hullding. Fuel Sere will Sawcut and dome
<br />approx. 300' lineal feet of concrete, excavate 18" deep, Install Y' pvc, dispose of debris, drill and set dowels In remaining slab 24" on center,
<br />Rackflll and pour and finish concrete, PVC will be ttansitioned to steel prior to rising out of trench with a seal offand extend be Weeder root as
<br />needed in EMT. Supply and pull new 2-wire shielded with drain cable from existing Inground transition to the new Weeder Root location.
<br />Trench will be coned and caution taped offto block traffic, Covering trench N not included, wood or steel plates to span trench for traffic Is
<br />not Included, customer Is welcome to supply and set steel plates in small area for traffic passage during work. Supply and pull new 2wdre
<br />shielded with drain cable from existing Veeder Root to (36) Weeder Root Sensors, Probes, PLLDs, etc Fuel Sam will terminate and land wire In
<br />existing Vander Root and Splice wire at oath sensor/probes existing junction box. Total cable amount not to exceed 13,090 feet. Alan R b
<br />assumed all existing conduit bath above and below ground is in good condition and will allow old cable removal and new cable Installation. I:
<br />Is also assumed all conduit and junctions meet the requirement for dedication to sensor and probe cables only, If any other cabling or wiring is
<br />found to he co -mingling it will have to he removed and rerouted at an additional cast. This Includes low voltage or communication cable/wire.
<br />This work Is limited to the (5) tanks (3-unl JAM 1-wa) and 9-fuel dispensers. Replacement ofjunctlon boxes due to frozen/missing/broken
<br />lids up to (1(l) units are included In this quote along with (90) seal offs. upon completion perform function test of all sensors, positive
<br />shutdown and overfill alarm. Schedule and perform ill final inspection/ monitor cart with Orange County Environmental Health. NOTE;
<br />Prevailing Wage it Included. I is assumed all existing sensors and probes are Weeder Root MFG and air cabling for sensors and probes are
<br />Belden 2-wire with shield and drain, if not Replacement Sedsars and Probes and Cabling are not included In this quote, TRENCH WILL CROSS
<br />THE YARD AND CREATE HINDRANCE ON YARD TRAFAC, Contractor will work Monday thru Friday lam to 4pm and will not be restricted in
<br />access unless a city recognized holiday Is encountered during project.
<br />EXCLUSIONS: If unforeseen conditions are encountered once Installation begins FJ Ward will notify the Cityand ask for Clarification an how to
<br />proceed and will advise ofany additional cast. Any requests by the city not specifically mentioned in the above scope ofwork will be an
<br />additional cost. Bonding ofany kind.