<br /> <br />16558-03 AQ & GHG Assessment 5 Warner Avenue Footlab <br />CONSTRUCTION EQUIPMENT <br />Equipment used for construction of the Project is shown in Table 3. <br />TABLE 3: CONSTRUCTION EQUIPMENT <br />Construction Activity Equipment Quantity Hours <br />Demolition <br />Concrete/Industrial Saws 1 8 <br />Excavators 3 8 <br />Rubber Tired Dozers 2 8 <br />Site Preparation Rubber Tired Dozers 3 8 <br />Crawler Tractors 4 8 <br />Site & Tenant <br />Improvements <br />Cranes 1 8 <br />Forklifts 3 8 <br />Generator Sets 1 8 <br />Tractors/Loaders/Backhoes 3 8 <br />Welders 1 8 <br />Landscape Median, <br />Misc. Hardscape, & <br />Access Ramp <br />Pavers 1 8 <br />Paving Equipment 2 8 <br />Rollers 2 8 <br />Tractors/Loaders/Backhoes 1 8 <br />Cement and Mortar Mixers 2 8 <br />Architectural Coating Air Compressors 1 8 <br />REGIONAL CONSTRUCTION EMISSIONS <br />The estimated maximum daily construction emissions without mitigation are summarized in Table <br />4. Under the assumed scenario, emissions resulting from the Project construction would not exceed <br />thresholds established by the SCAQMD for emissions of any criteria pollutant. Project construction- <br />source emissions impacts would therefore be less-than-signiffcant. Detailed construction model <br />outputs are presented in Appendix 1. <br />TABLE 4: CONSTRUCTION EMISSIONS SUMMARY <br />Year Emissions (lbs/day) <br />VOC NOX CO SO2 PM10 PM2.5 <br />Summer <br />2025 4.11 37.60 33.40 0.05 7.83 4.52 <br />Winter <br />2025 4.11 37.60 33.30 0.05 7.83 4.52 <br />2026 5.74 19.40 26.90 0.04 1.02 0.75 <br />Maximum Daily Emissions 5.74 37.60 33.40 0.05 7.83 4.52 <br />SCAQMD Regional Thresholds 75 100 550 150 150 55 <br />Threshold Exceeded? NO NO NO NO NO NO <br />