Laserfiche WebLink
Warner Ave. Footlab (Construction) Detailed Report, 4/4/2025 <br />20 / 31 <br />Subtotal —————————————————— <br />Sequest <br />ered <br />—————————————————— <br />Subtotal —————————————————— <br />Remove <br />d <br />—————————————————— <br />Subtotal —————————————————— <br />——————————————————— <br />5. Activity Data <br />5.1. Construction Schedule <br />Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description <br />Demolition Demolition 9/1/2025 9/29/2025 5.00 20.0 — <br />Site Preparation Site Preparation 9/30/2025 10/14/2025 5.00 10.0 — <br />Site & Tenant <br />Improvements <br />Building Construction 10/15/2025 2/3/2026 5.00 80.0 — <br />Landscape Median, Misc. <br />Hardscape,& Access <br />Ramp <br />Paving 1/7/2026 2/3/2026 5.00 20.0 — <br />Architectural Coating Architectural Coating 1/7/2026 2/3/2026 5.00 20.0 — <br />5.2. Off-Road Equipment <br />5.2.1. Unmitigated <br />Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor <br />Demolition Concrete/Industrial <br />Saws <br />Diesel Average 1.00 8.00 33.0 0.73 <br />Demolition Excavators Diesel Average 3.00 8.00 36.0 0.38 <br />Demolition Rubber Tired Dozers Diesel Average 2.00 8.00 367 0.40