Laserfiche WebLink
Warner Ave. Footlab (Construction) Detailed Report, 4/4/2025 <br />21 / 31 <br />Site Preparation Rubber Tired Dozers Diesel Average 3.00 8.00 367 0.40 <br />Site Preparation Crawler Tractors Diesel Average 4.00 8.00 87.0 0.43 <br />Site & Tenant <br />Improvements <br />Cranes Diesel Average 1.00 8.00 367 0.29 <br />Site & Tenant <br />Improvements <br />Forklifts Diesel Average 3.00 8.00 82.0 0.20 <br />Site & Tenant <br />Improvements <br />Generator Sets Diesel Average 1.00 8.00 14.0 0.74 <br />Site & Tenant <br />Improvements <br />Tractors/Loaders/Back <br />hoes <br />Diesel Average 3.00 8.00 84.0 0.37 <br />Site & Tenant <br />Improvements <br />Welders Diesel Average 1.00 8.00 46.0 0.45 <br />Landscape Median, <br />Misc. Hardscape, & <br />Access Ramp <br />Pavers Diesel Average 1.00 8.00 81.0 0.42 <br />Landscape Median, <br />Misc. Hardscape, & <br />Access Ramp <br />Paving Equipment Diesel Average 2.00 8.00 89.0 0.36 <br />Landscape Median, <br />Misc. Hardscape, & <br />Access Ramp <br />Rollers Diesel Average 2.00 8.00 36.0 0.38 <br />Landscape Median, <br />Misc. Hardscape, & <br />Access Ramp <br />Tractors/Loaders/Back <br />hoes <br />Diesel Average 1.00 8.00 84.0 0.37 <br />Landscape Median, <br />Misc. Hardscape, & <br />Access Ramp <br />Cement and Mortar <br />Mixers <br />Diesel Average 2.00 8.00 10.0 0.56 <br />Architectural Coating Air Compressors Diesel Average 1.00 8.00 37.0 0.48 <br />5.3. Construction Vehicles <br />5.3.1. Unmitigated <br />Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix <br />Demolition ————