My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 21 - Construction Contract for the Santa Ana Zoo Hive Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:24:57 AM
Creation date
9/10/2025 8:37:42 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
21
Date
9/16/2025
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 6 <br />PROJECT TITLE: <br />Santa Ana Zoo Educational Hub <br />PROJECT CATEGORY: <br />City & Park Facility Improvements <br />Park Facility <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 25/26CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The project goal is a building including a flex space, classroom(s), <br />and hub for community volunteers and education staff. The <br />classrooms are flexible in design and layout to maximize their use <br />potential throughout the day and year. The facility would use <br />environmentally sustainable materials in its construction. <br />PROJECT NEED: <br />This facility serves as a reception area for school children coming to <br />the zoo and is directly adjacent to the existing outdoor amphitheater. <br />Different sides of the building will open out to the general zoo area, the <br />amphitheater, or staff and service areas. <br />PROJECT COSTS <br />FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FY 30/31 FY 31/32 <br />Construction <br />1,697,875 - - - - - - <br />Contingency <br />356,327 <br />Engineering <br />2,399,880 <br />TOTAL <br />4,454,082 - - - - - - <br />SOURCE OF FUNDS <br />FY 25126 FY 26127 FY 27128 FY 28129 FY 29130 FY 30131 FY 31132 <br />123,430 - - - - - - <br />A & D District 3 <br />750,000 <br />CA RESOURCES AGENCY <br />1,649,880 <br />GRANT <br />Cannabis <br />873,759 <br />CAPITAL OUTLAY/CELL <br />339,795 <br />TOWER <br />GENERAL FUND <br />645,953 <br />PRCSA F&D <br />71,265 <br />TOTAL <br />4,454,082 - - - <br />DIVISION: <br />CIP Engineering <br />CONTACT: <br />Gilbert Castillo, Senior Engineer <br />DATE: <br />28-Aug-2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.