My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 MITIGATION MONITORING AND REPORTING PROGRAM <br />Table 4-1: Mitigation Monitoring and Reporting Program <br />Regulatory Requirements/Mitigation Measures <br />Timing <br />Responsible <br />Monitoring <br />Signature/Date <br />Party <br />Party <br />of Compliance <br />AIR QUALITY <br />RR AQ-1 <br />New buildings are required to achieve the current <br />Prior to the <br />Property Owner <br />City of Santa <br />California Building Energy Efficiency Standards <br />issuance of <br />or Project <br />Ana Planning <br />(Title 24, Part 6) and California Green Building <br />occupancy <br />Applicant <br />Division <br />Standards Code (CALGreen) (Title 24, Part 11). <br />permits <br />The 2019 Building Energy <br />Efficiency Standards became effective January 1, <br />2020. The Building and Energy Efficiency <br />Standards and CALGreen are updated tri-annually <br />with a goal to achieve net zero buildings energy for <br />2030. <br />RR AQ-2 <br />Construction activities will be conducted in <br />During <br />Project <br />City of Santa Ana <br />compliance with California Code of Regulations, <br />construction <br />Applicant/ <br />Building <br />Title 13, Section 2449, which requires that <br />Construction <br />Safety Division <br />nonessential idling of construction equipment is <br />Contractor <br />restricted to five minutes or less. <br />RR AQ-3 <br />Construction activities will be conducted in <br />Prior to <br />Project <br />City of Santa Ana <br />compliance with any applicable South Coast Air <br />demolition and <br />Applicant/ <br />Building <br />Quality Management District rules and regulations, <br />during <br />Construction <br />Safety Division <br />including but not limited to: <br />construction <br />Contractor <br />• Rule 403, Fugitive Dust, for controlling <br />fugitive dust and avoiding nuisance. <br />• Rule 402, Nuisance, which states that a <br />project shall not "discharge from any <br />source whatsoever such quantities of air <br />contaminants or other material which <br />cause injury, detriment, nuisance, or <br />annoyance to any considerable number of <br />persons or to the public, or which endanger <br />the comfort, repose, health or safety of any <br />such persons orthe public, orwhich cause, <br />or have a natural tendency to cause, injury <br />or damage to business or property." <br />City of Santa Ana <br />August 2025 <br />4-2 <br />The Village Santa Ana Specific Plan Project <br />Final Supplemental Environmental Impact Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.