Laserfiche WebLink
4 MITIGATION MONITORING AND REPORTING PROGRAM <br />Regulatory Requirements/Mitigation Measures <br />Timing <br />Responsible <br />Party <br />Monitoring <br />Party <br />Signature/Date <br />of Compliance <br />• Rule 1113, which limits the volatile organic <br />compound content of architectural <br />coatings. <br />• Rule 1466, Soil Disturbance. Projects that <br />involve earth -moving activities of more <br />than 50 cubic yards of soil with applicable <br />toxic air contaminants are subject to this <br />rule. <br />GPU PEIR <br />Prior to discretionary approval by the City of Santa <br />Prior to <br />Project <br />City of Santa <br />Note: This <br />MM AQ-1 <br />Ana for development projects subject to CEQA <br />discretionary <br />Applicant <br />Ana Planning <br />measure has been <br />(California Environmental Quality Act) review (i.e., <br />approval <br />Division <br />satisfied with the <br />non-exempt projects), project applicants shall <br />analysis in The <br />prepare and submit a technical assessment <br />Village at Santa <br />evaluating potential project construction -related <br />Ana Supplemental <br />air quality impacts to the City of Santa Ana for <br />EIR, as described <br />review and approval. The evaluation shall be <br />on p. 4.1-38 of the <br />prepared in conformance with South Coast Air <br />Draft <br />Quality Management District (SCAQMD) <br />Supplemental EIR. <br />methodology for assessing air quality impacts. If <br />construction -related criteria air pollutants are <br />determined to have the potential to exceed the <br />SCAQMD's adopted thresholds of significance, <br />the City of Santa Ana shall require that applicants <br />for new development projects incorporate <br />mitigation measures to reduce air pollutant <br />emissions during construction activities. These <br />identified measures shall be incorporated into all <br />appropriate construction documents (e.g., <br />construction management plans) submitted to the <br />City and shall be verified by the City. Mitigation <br />measures to reduce construction -related <br />emissions could include, but are not limited to: <br />• Require fugitive -dust control measures <br />that exceed SCAQMD's Rule 403, such <br />as: <br />City of Santa Ana <br />August 2025 <br />4-3 <br />The Village Santa Ana Specific Plan Project <br />Final Supplemental Environmental Impact Report <br />