My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Correspondence - Item 28
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Correspondence - Item 28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2025 7:41:18 AM
Creation date
9/10/2025 10:11:44 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 2(continued) <br /> iii, For the emission control technology installed:technology type,serial number,make,model, <br /> manufacturer,EPAICARB verification nu..mberllevel,and installation date and hour-meter reading on <br /> Installation date. <br /> — Establish generator sites and truck-staging zones for vehicles waiting to load or unload material on site. <br /> Such zones shall be located where diesel ern issions have the least impact on abutters,the general <br /> public,and especially sensitive receptors such as hospitals,schools,daycare facilities,elderly housing, <br /> and convalescent facilities. <br /> — Maintain a monthly report that,for each on goad diesel vehicle,nonroad construction equipment,or <br /> generator o nsite,includes: <br /> i. Hour-meter readings on arrival on-site,the first and last day of every month,and on off-site date. <br /> 1. Any problems with the equipment or emission controls. <br /> iii. Certified copies of fuel deliveries for the time period that identify: <br /> t. Source of supply <br /> 2. Quantity of fuel <br /> 3. Quantity of fuel,including sulfur content(percent by weight) <br /> cc)Promote energy efficiency and exceed Title-24 Building Envelope Energy Efficiency Standards(California <br /> Building Standards Code): <br /> — Install programmable thermostat timers <br /> — Obtain Third-party HVAC commissioning and verification of energy savings(to be grouped with <br /> exceedance of Title 24). <br /> — Install energy efficient appliances(Typical reductions for energy-efficient appliances can be found in <br /> the Energy Star and Other Climate Protection Partnerships Annual Reports) <br /> — Install higher efficacy public street and area lighting <br /> — Limit outdoor lighting requirements <br /> — Replace traffic lights with LED traffic lights <br /> — Establish onsite renewable or carbon neutral energy systems—generic,solar pourer and wind power <br /> — Utilize a combined heat and power system <br /> dd)Promote transportation efficiency.The following measures can be used to increase transportation <br /> efficiency. <br /> — Locate project near bike path/bike lane <br /> — Provide pedestrian network improvements,such as interconnected street network'narrower roadways <br /> and shorter block lengths,sidewalks,accessibility to transit and transit shelters,traffic calming <br /> measures,parks and public spaces,minimize pedestrian barriers. <br /> — Provide traffic calming measures,such as: <br /> i. Marked crosswalks <br /> i. Count-down signal timers <br /> iii. Curb extensions <br /> iv. Speed tables <br /> v. Raised crosswalks <br /> vi. Raised intersections <br /> vii.Median islands <br /> viii.Tight corner radii <br /> x. Roundabouts or mini-circles <br /> x. On-street parking <br /> xi. Chicanes/chokers <br /> — Create urban non-motorized zones <br /> — Provide bike parking in non-residential and multi-unit residential projects <br /> — Dedicate land for bike trails <br /> — Limit parking supply through: <br /> i. Elimination(or reduction)of minimum parking requirements <br /> . Creation of maximum parking requirements <br /> iii. Provision of shared parking <br /> — Require residential area parking permit. <br /> — Provide ride-sharing programs. <br /> i. Designate a certain percentage of parking spacing for ride sharing vehicles <br /> i. Designating adequate passenger loading and unloading and waiting areas for ride-sharing vehicles <br /> iii. Providing a web site or messaging board for coordinating rides <br /> iv. Permanent transportation management association membership and finding requirement. <br /> ee)Lengthen the construction period during smog season(May through October)by extending the <br /> construction hours per workday or number of days worked per week,to minimize the number ofvehicles <br /> and equipment operating at the same time. <br /> ff) Install signage containing the complaint number of the local air district where construction activities are <br /> located at the construction sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.