Laserfiche WebLink
Figure 2(continued) <br /> PIn1M GHG-1:. In accordance with provisions of Sections 15091(a)(2)and 15125A(a)(1)(B)of the State CECjA Guidelines,a lead Ongoing over the Lead Agency <br /> agency for a project can and should consider mitigation measures to reduce substantial adverse effects related life of the plan <br /> to greenhouse gas emissions.Such measures may include the following or other comparable measures <br /> identified by the lead agency: <br /> a) Integrate green building measures consistent with CALGreen(California Building Code Title 24),local <br /> building codes and other applicable laws,into project design including: <br /> i) Use energy efficient materials in building design,construction,rehabilitation,and retrofit, <br /> ii) Install energy-efficient lighting,heating,and cooling systems(cogeneration);water heaters;appliances; <br /> equipment;and control systems. <br /> ii,) Reduce lighting,heating,and cooling needs bytaking advantage of light-colored roofs,trees forshade, <br /> and sunlight <br /> Iv) Incorporate passive environmental control systems thataccount forthe characteristics ofthe natural <br /> environment. <br /> v) Use high-efficiency lighting and making devices. <br /> v) Incorporate passive solar design. <br /> vl)Use h ig h-reftectivity build ing materials anal multiple glazi ng. <br /> vii)Use no gas-powered landscape maintenance equipment <br /> ix) Install altemative fuel(.e.,electric,hydrogen-fueled,etc.)vehicle charging and fueling stations. <br /> x) Reduce woad burning staves or fireplaces. <br /> xi) Provide bike lanes accessibility and packing at residential developments. <br /> xis Encourages projects to reduce natural gas infrastructure in buildings and/or reduce the use of natural <br /> gas appliances,with exceptions for limited uses. <br /> b) Reduce emissions resulting from projects through implementation of project features,project design,or <br /> othermeasures,such as those described in Appendix Fofthe State CEQA Guidelines. <br /> c) Include off-site measures to mitigate a project's emissions. <br /> d) Measures that consider incorporation of Best Available Control Technology(BACT)during design, <br /> construction,and operation of projects to minimize(;HG emissions,including but not limited to: <br /> i) Use energy and fuel-efficient vehicles and equipment; <br /> i) Deployment of zero-and/or rear zero emission technologies; <br /> ii) Use lighting systems that are energy efficient,such as LED technology; <br /> iv) Use the minimum feasible amount of GHG-emitting construction materials; <br /> v) Use cement blended with the maximum feasible amount of flash or other materials that reduce GHG <br /> emissions from cement production; <br /> v) Incorporate design measures to reduce GHG emissions from solid waste management through <br /> encouraging solid waste recycling and reuse; <br /> vi)Incorporate design measures to reduce energy consumption and increase use of renewable energy; <br /> vui)Incorporate design measures to reduce water consumption; <br /> Ix) Use fighter-colored pavement where feasible; <br /> x) Recycle construction debris to maximum extent feasible; <br /> xi) Plant shade trees in or near construction projects where feasible;and <br /> xi7 Solicit bids that include concepts listed above. <br /> e) Measures that encourage transit use,carpooling,bike-share and car-share programs,active transportation, <br /> and parking strategies.,including,but not limited to the following:. <br /> i) Promote transit-active transportation coordinated strategies <br /> in Increase bicycle carrying capacity on transit and rail vehicles; <br /> ii) Improve or increase access to transit; <br /> iv) Increase access to common goods and services,such as groceries,schools,day care,and medical care; <br /> v) Incorporates housing,including affordable housing,into the project; <br /> v) Incorporate a neighborhood electric vehicle network; <br /> v[i)Orient the project toward transit,bicycle,and pedestrian facilities, <br /> viir]Improve pedestrian or bicycle networks,or transit service <br /> ix) Provide traffic calming measures <br /> x) Provide bicycle parking; <br /> xi) Unnt or eliminate park supply, <br /> xis Unbundle parking casts; <br /> xii)Provide parking cash-out programs; <br /> xiv)Implement or provide access to commute reduction program; <br /> Q Incorporate bicycle and pedestrian facilities into project designs,maintain these facilities,and provide <br /> amenities incentivaing their use,'and plan for and construct local bicycle projects that connect with the <br /> regional network; <br /> g) Improve transit access to rail and bus routes by incentives for construction of transit facilities within <br /> developments,and/or providing dedicated shuttle service to transit stations; <br /> h) Adopt employer trip reduction measures to reduce employee trips such as vanpool and carpool programs, <br /> provide end-of-trip facilities,and telecommuting programs including but not limited to measures that: <br /> i) Provide car-sharing,bike sharing,and ride-sharing programs; <br /> i) Provide transit passes; <br />