Laserfiche WebLink
The Village Santa Ana Specific Plan Project <br />Thus, impacts related to air quality and transportation uses (including vehicle miles <br />travelled and a transportation demand management (“TDM”) plan)—as studied in the SEIR— <br />reflect potentially more impactful uses than a hotel. As a result, the commenter’s claim that the <br />SEIR did not include the appropriate analysis is inapposite. By studying the maximum buildout, <br />the SEIR inherently studies the potential environmental impacts of less intense uses such as <br />hotel. The SEIR studied feasible mitigation to reduce potential environmental impacts relating to <br />air quality, transportation, and other subjects. With respect to transportation impacts and the <br />commenter’s suggestions for additional strategies and mitigation measures, the SEIR found that <br />transportation impacts would be less than significant. Accordingly, a TDM plan is not a mitigation <br />measure required by the environmental analysis. Thus, requiring additional performance metrics <br />as suggested by the commenter is not a CEQA issue. However, the City will take into <br />consideration these additional strategies that the commenter suggests. Given that the SEIR <br />studied potential impacts of the potential maximum buildout, the proposed mitigation provided in <br />the SEIR is appropriate. <br />The City notes that the Specific Plan includes an Administration and Implementation <br />Chapter which details the additional future review of any development with the Specific Plan area. <br />Pursuant to this Chapter, any future development project must obtain approval of a Development <br />Project Plan Review. (See Specific Plan, § 6.3.3.) Thus, to the extent a hotel is included in the <br />buildout of the Project’s commercial uses, that use will be subject to further City review during the <br />Development Project Plan Review process. <br />IV. A Hotel Use is Consistent with the Property’s General Plan Land Use Designation <br />As described above, the proposed Specific Plan defines permissible uses within the <br />Specific Plan area. Under the Specific Plan, hotel uses are permitted by right or subject to <br />conditional approval depending on the number of other uses with onsite alcohol sales already <br />permitted. (See Specific Plan Table 4-1.) The Specific Plan’s use mix is consistent with the City’s <br />General Plan. Under the General Plan Land Use Plan, the Property is designated as District <br />Center – High (DC-5), which allows a mix of uses consistent with new urban-scale development. <br />Uses include residential, retail, commercial, office, and entertainment uses. Taken together, the <br />proposed Specific Plan would amend the City’s zoning code to allow hotel uses on the Property <br />consistent with the mixed-use urban development contemplated by the General Plan. <br />The City’s diverse and varied mix of urban and suburban environments allow for many <br />land use types and use intensities. As shown in the General Plan Land Use Plan, the pattern and <br />distribution of land uses differ depending on the character of the surrounding environment. As a <br />result, the commenter’s review of land uses and hotel uses in other areas of the City is not relevant <br />to the Project or the required findings that the City considers when making a determination on the <br />Project. <br />Even so, the commenter’s review provides support for an opposite conclusion – there is <br />precedent for hotels permitted “by right” in many other areas of the City. Indeed, the commenter <br />provides an analysis of the City’s zoning code, Special Districts (“SD”), and Specific Plans in an <br />effort to show that a hotel use is unwarranted on the Property. However, as the commenter points <br />out, hotel uses has been permitted in other SDs and Specific Plan areas dating back to 1977 and <br />as recently as the 2019 Main Place Specific Plan and 2024 Related Bristol Specific Plan. (See <br />Letter, pg. 15-16.) <br />City of Santa Ana September 2025 <br /> <br />4 <br />55394.00067\\44182451.1 <br /> <br />