My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2025-10-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
10/21/2025
>
Agenda Packet_2025-10-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2025 8:29:41 AM
Creation date
10/14/2025 7:09:35 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/21/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
707
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEWIDE SANITARY SEWER SYSTEMS GENERAL ORDER 2022-0103-DWQ <br />ATTACHMENT D SEWER SYSTEM MANAGEMENT PLAN REQUIRED ELEMENTS <br />Table of Contents <br />1. Sewer System Management Plan Goal And Introduction............................................D-2 <br />1.1. Regulatory Context...........................................................................................D-2 <br />1.2. Sewer System Management Plan Update Schedule.........................................D-3 <br />1.3. Sewer System Asset Overview.........................................................................D-3 <br />2. Organization................................................................................................................D-3 <br />3. Legal Authority.............................................................................................................D-4 <br />4. Operation And Maintenance Program..........................................................................D-4 <br />4.1. Updated Map of Sanitary Sewer System..........................................................D-4 <br />4.2. Preventive Operation and Maintenance Activities.............................................D-4 <br />4.3. Training.............................................................................................................D-5 <br />4.4. Equipment Inventory.........................................................................................D-5 <br />5. Design And Performance Provisions...........................................................................D-5 <br />5.1. Updated Design Criteria and Construction Standards and Specifications.........D-5 <br />5.2. Procedures and Standards................................................................................D-5 <br />6. Spill Emergency Response Plan..................................................................................D-6 <br />7. Sewer Pipe Blockage Control Program........................................................................D-7 <br />8. System Evaluation, Capacity Assurance and Capital Improvements...........................D-7 <br />8.1 System Evaluation and Condition Assessment.................................................D-7 <br />8.2. Capacity Assessment and Design Criteria........................................................D-8 <br />8.3. Prioritization of Corrective Action......................................................................D-9 <br />8.4. Capital Improvement Plan.................................................................................D-9 <br />9. Monitoring, Measurement and Program Modifications.................................................D-9 <br />10. Internal Audits............................................................................................................D-10 <br />11. Communication Program...........................................................................................D-10 <br />ATTACHMENT D SEWER SYSTEM MANAGEMENT PLAN <br />REQUIRED ELEMENTSDecember 6,2022 <br />D-1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.