Laserfiche WebLink
STATEWIDE SANITARY SEWER SYSTEMSGENERAL ORDER2022-0103-DWQ <br />2.SPILL-SPECIFIC MONITORING REQUIREMENTS <br />2.1Spill Location and Spread <br />TheEnrolleeshall visually assessthespill location(s)andspreadusing photography, <br />global positioning system(GPS), and other best available tools.The Enrollee shall <br />document the critical spilllocations, including: <br />Photographyand GPS coordinates for: <br />o Thesystem location where spill originated. <br />For multiple appearance points of a single spillevent,the points closest to the <br />spill origin. <br />Photographyfor: <br />o Drainage conveyance system entry locations, <br />o The location(s) of dischargeinto surface waters, as applicable, <br />o Extentofspillspread,and <br />o The location(s) of clean up. <br />2.2Spill Volume Estimation <br />To assess the approximate spill magnitudeand spread, theEnrolleeshall estimatethe <br />totalspillvolume using updated volume estimation techniques, calculations, and <br />documentation for electronic reporting.TheEnrolleeshall update its notification and <br />reporting of estimated spillvolume (which includes spillvolume recovered) as further <br />information is gathered during and after a spillevent. <br />2.3. Receiving Water Monitoring <br />2.3.1.Receiving Water Visual Observations <br />Through visual observations and use of best available spillvolume-estimating <br />techniquesand field calculationtechniques, the Enrollee shall gatherand documentthe <br />following information for spills discharging to surface waters: <br />Estimatedspilltravel time to the receiving water; <br />For spills entering a drainage conveyance system,estimatedspilltravel time from <br />the point of entry into the drainage conveyancesystemto the point of dischargeinto <br />thereceiving water; <br />Estimatedspill volume entering the receiving water;and <br />Photographyof: <br />o Waterbody bank erosion, <br />o Floating matter, <br />o Water surface sheen (potentially from oil and grease), <br />ATTACHMENT E1NOTIFICATION,MONITORING,REPORTING <br />AND RECORDKEEPINGREQUIREMENTSDecember 6,2022 <br />E1 -5 <br /> <br />